5) Regraded and spread the topsoil. <br />6) Seeded and mulched the North Pit area as described in the revegetation plan. <br />Permanently Reclaimed Spoils Area <br />The Permanently Reclaimed Spoils Area (PRSA) provided fill for the North Pit and <br />North Pit Haul Road reclamation. Approximately 0.5 acres were disturbed. <br />Reclamation of the PRSA involved the following tasks undertaken between May and <br />August 2006: <br />1) Stripped topsoil from the area of the PRSA to be used as fill. <br />2) Removed fill for use at the North Pit and North Pit Haul Road. <br />2) Regraded and finish graded the sideslopes, outslopes, and surfaceafter completion of <br />fill haulage. <br />3) Replaced stripped topsoil from the PRSA, covering the areawith eight to twelve <br />inches of topsoil. <br />4) Seeded and mulched the PRSA area disturbedas described in the revegetation plan. <br />Topsoil Stockpile #2 <br />Topsoil Stockpile #2 was thesource for replacement topsoil during the reclamation of the <br />North Pit, North Pit Haul Road, PRSA, and South Pit Drill Pad. It comprised 2.69 acres. <br />Reclamation of Topsoil Stockpile #2 involved the following tasks undertaken between <br />May and August 2006: <br />11) Loaded and hauled needed topsoil from the stockpile. This task was accomplished <br />with tracked excavator and articulated dump truck team. <br />2) Regraded and finish graded the area with a motor grader, leaving a base of eight to <br />twelve inches of topsoil. <br />4) Diskedthe topsoil. <br />5) Seeded and mulched the North Pit area as described in the revegetation plan. <br />South Pit Drill Pad <br />The South Pit Drill Pad was an area at the northwest corner of the South Pit that had been <br />leveled in advance of drilling and blasting. It comprised less than two acres. <br />Abridged Permit Document 5-9 Permit Renewal RN04 4/2014 <br />