My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-06_PERMIT FILE - C1992080A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992080A
>
2014-05-06_PERMIT FILE - C1992080A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:47 PM
Creation date
12/8/2015 9:01:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
5/6/2014
Doc Name
Revised Permit Document
From
Oakridge Energy, Inc.
To
DRMS
Section_Exhibit Name
Abridged Permit Document (RN-4)
Email Name
MLT
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) Returneddownspoiled fill from the slope below to the North Pit bencharea. <br />Downspoiled material wasused to partially backfill the bench area and sandstone scarp. <br />A large tracked excavator wasemployed for this task, sited on an intermediate bench <br />below the main bench. <br />2) Movedthe recovered spoiled fill material to the base of the bench adjacent to the <br />sandstone at the inside edge of the bench using the tracked excavator. <br />3) Movedboulders and cobble material from the bench area to the inside edge of the <br />bench prior to backfilling. This was undertaken with a bulldozer andtracked excavator. <br />4) Loaded and hauled needed fill from the Permanently Reclaimed Spoils Area below the <br />North Pit. Backfilling lefta 30 foot wide bench with the North Pit backfilled againstthe <br />sandstone scarp to a grade of 3H:1V (see Cross-Section Map). This task was <br />accomplished with trackedexcavatorand articulated dump truck team. <br />5) Regradedthe North Pit bench fill to final contour with a bulldozerand motor grader. <br />6) Loaded and hauledtopsoil from Topsoil Stockpile #2,coveringthe entire North Pit <br />bench fill area and downslope areawith eight to twelve inches of topsoil. <br />7) Regraded and spreadthe topsoil. <br />8)Seeded and mulchedthe North Pit area as described in the revegetation plan. <br />North Pit Haul Road Reclamation <br />The North Pit Haul Road provided access to the North Pit during the operation of the <br />Carbon Junction Mine. Pre-reclamation disturbance consistedof the 40-60 foot roadway <br />and outslope material. <br />Reclamation of the North Pit involved the following tasks undertaken between May and <br />August 2006: <br />1) Loaded and hauled needed fill from the Permanently Reclaimed Spoils Area. <br />Backfilling left a 30 foot wide road surface with roadside slopes backfilled to a grade of <br />3H:1V (see Cross-Section Map). This task was accomplished with tracked excavator and <br />articulated dump truckteam. <br />2) Regraded and finish graded the sideslopes, outslopes, and road surface. <br />3) Loaded and hauled topsoil from Topsoil Stockpile #2, covering the entire North Pit <br />Haul Road sideslopes and downslope areas with eight to twelve inches of topsoil. <br />4) Placed large sandstone donnikers on the roadside slopes for wildlife habitat. Re-cut <br />drainage ditches on the sides of the roadway. <br />Abridged Permit Document 5-8 Permit Renewal RN04 4/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.