My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-03_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-12-03_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 1:50:25 AM
Creation date
12/3/2015 4:17:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
12/3/2015
Doc Name
Final Report, QA Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK &VICTOR GOLD MINING Co. 'f <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> Geomembrane: <br /> Geomembrane installation within Phase 1 continued this week performing deployment, seaming, <br /> repair, and QA/QC activities. Approximately 201,967 square feet of 80mil LLDPE geomembrane <br /> was deployed. Soil Liner Fill was inspected and approved by AMEC, Ames and ECA <br /> representatives prior to geomembrane deployment. Approximately 9,594 linear feet of seam was <br /> fusion welded during deployment using one or two fusion welding machines for each day of <br /> deployment. Approximately 634 linear feet of seam was extrusion welded during deployment. <br /> Destructive and non-destructive testing was completed in compliance with project technical <br /> specifications. <br /> Ames continuously excavated anchor trench ahead of geomembrane installation. After <br /> geomembrane testing was completed, the anchor trench above finished panels was backfilled <br /> and compacted per project specifications. <br /> See attached figure for approved geomembrane. <br /> II) Storm Water Management <br /> Best Management Practices (BMPs) continued to be performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.