Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> CQA ACTIVITIES: <br /> 1) Field Activities: <br /> The following activities were observed: Placement and compaction of the Phase 1 Structural Fill <br /> materials;subgrade acceptance; placement,compaction, density testing,depth verification and <br /> acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br /> placement; leak detection construction; and pump monitoring at the LVSCS riser pipes. <br /> II) Laboratory Activities: <br /> Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. <br /> The following samples were collected: Phase 1 —Sol[ Liner Fill; 1-SLF-43-R <br /> Cameron—Soil Liner Fill; SLF-194-C <br /> General Project Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held September 8, 2015(Amec Foster Wheeler, CC&V, Ames). <br /> Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br /> Contractor Meeting. <br /> ➢ Ames daily safety meetings <br /> ➢ Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects,Amec Foster <br /> Wheeler, and Ames. <br /> Deliveries: ECA received 36 rolls of 80-mil LLDPE textured geomembrane. <br /> . CQA Monitor l <br /> Submitted by: Date: September 17, 2015 <br /> Bobby Redd,El <br /> Project Resident _ —— <br /> Reviewed b <br /> Y� <br /> CC&V Projects <br /> - <br /> Reviewed By: ,, Date: <br /> c <br /> Reviewed By: Date: <br />