My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-03_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-12-03_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 1:50:25 AM
Creation date
12/3/2015 4:17:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
12/3/2015
Doc Name
Final Report, QA Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> Subgrade: <br /> Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br /> See attached figure for approved subgrade. <br /> Soil Liner Fill: <br /> A Cat smooth drum roller, a Cat excavator and a water truck conditioned and compacted SLF <br /> prior to geomembrane deployment. <br /> Cat 777 haul trucks transported processed SLF from the Cameron area to a temporary stockpile <br /> at station 48+00 of the ADR haul road. Cameron SLF processing continued. <br /> Cat 777 haul trucks transported SLF to the ADR haul road between stations 16+00 to 22+00. Cat <br /> dozers placed SLF between stations 14+00 to 22+00. A Cat smooth drum roller compacted the <br /> SLF surface. <br /> Cat dozers placed SLF below stations DO+00 to D8+00 and F12+00 to F20+00. A Cat smooth <br /> drum roller compacted the SLF surface below stations F16+00 to F20+00. <br /> A Cat dozer placed SLF between stations FM8+00 to FM16+00 and HM10+00 to HM16+00. <br /> All of the above Soil Liner Fill material was placed, graded, and compacted per the project plans <br /> and specifications. Moisture content, density testing and depth verification were performed per <br /> project specification prior to surface acceptance and geomembrane installation. <br /> See attached figure for approved SLF. <br /> Drain Cover Fill: <br /> Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br /> dozers placed DCF on approved geomembrane in Phase 1. <br /> See attached figure for approved DCF. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: None. <br /> Tertiary Underdrain: None. <br /> Leak Detection: <br /> A Cat excavator prepared leak detection trench between stations FM6+00 to FM8+00. A Cat <br /> skidsteer assisted with construction and backfill of approximately 200LF of leak detection. All <br /> work was completed per project plans and specifications. <br /> Miscellaneous: <br /> Amec personnel continued LVSCS pump monitoring and observation. <br /> DRMS corrective action draft response to PSSA pond slope stability for Projects and ERD review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.