Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: September 12, 2015 <br /> Location: Cripple Creek &Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 9.6.2015 through 9.12.2015 <br /> Days S I M I T W T F S <br /> D D D D D <br /> Work Shifts <br /> D=Day Shift N=Night Shift W=Weather <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 64°F to 72°F Cloud Cover: Partly Cloudy to Mostly Cloudy <br /> Lows: 42°F to 47°F Precipitation: None <br /> Wind: Calm to moderate <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF (PSSA, Phase 1, and 2) <br /> Structural Fill: <br /> The following Structural Fill haul to fill and grading activities occurred: <br /> A Cat dozer prepared subgrade below stations HM4+00 to HM8+00 and JM2+00 to JM4+00. <br /> A Cat dozer prepared subgrade above stations F28+00 to FM4+00 and below stations L10+00 to <br /> LM2+00. <br /> A GPS equipped Cat D6 dozer finished subgrade between stations 16+00 to 22+00 of the ADR <br /> haul road. <br /> A Cat excavator loaded Cat 740 haul trucks with Structural Fill from above station DMO+00. The <br /> material was transported to stations F24+00 to F26+00 where a Cat dozer placed Structural Fill. <br /> A Cat smooth drum roller compacted the fill area. <br /> CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br /> placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br /> compacted the fill area. <br /> All of the above Structural Fill material was placed, compacted, and graded per the project plans <br /> and specifications. <br />