Laserfiche WebLink
CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF)WEEKLY REPORT foster <br /> wheeler <br /> Anaconda Mine complex: One Cat D10 dozer and one JD670 excavator removed shot rock in <br /> preparation for geogrid and concrete cap. A Sandvik 800 track drill prepared a production shot <br /> pattern in preparation for geogrid installation. Remediation to be continued. <br /> II) Storm Water Management <br /> Best Management Practices(BMPs)continued to be performed. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: <br /> Field activities and observation during this reporting period included: Slope grading, structural fill <br /> placement, SLF, SSF, and SF sampling, SO placement in the PSSA, underground working <br /> remediation, pumping of the LVSCS riser pipes, ADR2 waterline excavation, and subgrade <br /> preparation of the A bench. <br /> II) Laboratory Activities: <br /> Atterberg limits, moisture, laboratory compaction, and sieve analysis laboratory testing continued. <br /> The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br /> ➢ Soil Liner Fill: SLF-176-C, 1SLF-4-R, Select Structural Fill: SSF-14-R <br /> General Proiect Items <br /> Meetings and Discussions: <br /> Y The Weekly Contractor Meeting was held March 25, 2015(Amec Foster Wheeler, CC&V, Ames) <br /> Ames daily safety meetings <br /> Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling were some of the tasks occurring between CC&V <br /> Projects, Amec Foster Wheeler, and Ames. <br /> Deliveries: None. <br /> Submitted b Mike Moore <br /> Y� Date: April 1, 2015 <br /> Reviewed by: '&aiAat 'b,(iYL , / Date: -411 ( 26 1-t-, — <br /> CC&V Projects <br /> Reviewed By: Date: 'q A A5 <br /> Reviewed By: � Date: -/ -.LS' <br />