Laserfiche WebLink
i. <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> ATTACHMENT A <br /> Amec Foster Wheeler-2015 CQA Field Staff Schedule MLE2 <br /> Name Sun. Mon. Tues. Wed. Thurs. Fri. Sat. <br /> Mar. 22 Mar. 23 Mar. 24 Mar. 25 Mar.26 Mar. 27 Mar. 28 <br /> Mike Moore PR PR PR PR PR PR <br /> Eric Lorenson ST ST ST ST <br /> Ben Melly ST ST ST ST ST ST <br /> Robert Redd UG UG UG UG UG <br /> Tyler Browning ST ST ST ST ST <br /> Rex Harrison WI WI WI WI WI WI <br /> Rick Buxton STNVI ST/WI ST/WI STNVI STNVI STNVI <br /> Razi Molloy LT LT LT LT <br /> Andrea Meduna PM <br /> LEGEND: <br /> UM = Unit Manager <br /> PM = Project Manager <br /> PCE = Project Certifying Engineer <br /> PE = Project Engineer <br /> PR = Project Resident <br /> LG = Lead Geosynthetics Engineer <br /> LS = Lead Soils Technician <br /> ST = Soil Technician <br /> LT= Laboratory Technician <br /> GL = Geosynthetics Lead <br /> GT= Geosynthetics Technician <br /> FLM= Field/Laboratory Manager <br /> UG = Underground Working Remediation <br /> SE = Senior Engineer <br /> GS = Geophysics Survey Geologist <br /> HY = Highway Design Engineer <br /> WI =Welding Inspector <br />