Laserfiche WebLink
Truck/Loader Team Work cont'd Task#: 001 sheet 2 of 2 <br /> .....:............ <br /> Loadina Tool Cycle Time: Number of loading tool passes required to fill truck: -2--------,-Passes <br /> cxc:dvaiuiS anu IIUIIi ailuvcia-fudGiuu6�,Ytia U11M VD.jUu LVIIUILIV11 td riiy: NA <br /> -selected value within basic rating: NA <br /> T-1,L—+— NA - <br /> ----- ------- =e time elements(mia.):---J.oadT-----AIA---- --IVA_._..____._ _Dump:---OJD0----------__._. _--- <br /> Wheel and track loaders-unadjusted basic loader cycle time(load,maneuver,and dumK 0.650 minutes <br /> Cycle Time Factors ILoading Condition Description Factor(min.) I Source <br /> Material:No adjustment-factor not applicable 0.000 (Cat HB) <br /> Stockpiie:iConveyor or dozer piled 10 ft.high and up 0.000 1 (Cat HB) <br /> Truck ownership:Common ownership of trucks and loaders -0.040 (Cat HB) <br /> Operation:Constant operation -0.040 (Cat HB) <br /> Dump target Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment -0.080 minutes <br /> Adjusted loader cycle time(total time per loader pass): 0.570 minutes <br /> Net load time per truck*: 0.670 minutes <br /> Truck Cycle Time: *bulk of 1 st loader cycle completed during truck exchange if adj.loader cycle time<exchange time <br /> Truck exchange time**: 0.75 minutes........ Adjusted for site altitude: 0.750 minutes <br /> Truck load time: 0.670 minutes........ Adjusted for site altitude: 0.670 minutes <br /> i IUL;k rnaneuvel dnd dump lime: 1.15 rrlinuids........ Mujusiea iur siie annuue. 1.150 ininuies <br /> **set at 0 if exchange time<adj.loader cycle time(truck exchange completed during 1 st loader cycle) <br /> Truck travel(haul&return)time: Road condition:Firm,smooth,rolling,dirblt. surfaced, watered,maintained <br /> Haul route: <br /> Road Haul distance Grade Rolling Total Speed Travel time <br /> segment (feet) res.(°!1 res. (%M rasistanrra roil (feeUminute) (minutes, <br /> 1 3,780 0.00 3.00 2486 1.843 <br /> Return route: Haul time** 1.843 minutes <br /> 1 3,780 0.00 3.00 3.00 3550 1.252 <br /> I I <br /> "travel time shown for each segment includes acceleration/deceleration adjustment Keturn time—: 1.252 minutes <br /> total haul and return time shown includes altitude adjustment Total truck cycle time: 5.665 minutes <br /> LuQi;ii y tuul❑.lit piuJu�tici-,. 1,440.85 LCY;1 uur...... ; ; " i; y': 1,195.90 LCY,Ihuur <br /> Truck unit production: 361.16 LCY/hour...... Adjusted for job efficiency: 299.76 LCY/hour <br /> wr.0 idi no.uucGa'luau!„y wvi. 4 trucks........... 4 uwc 1w <br /> Adjusted hourly truck team production: 1,199.05 LCY/hr <br /> Adjusted hourly single truck/loader team production : 1,195.90 LCY/hr <br /> Adjusted hourly multiple truck/loader team production: 1,195.90 LCY/hr <br /> ... <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 635.50 Hours <br /> Unit cost: $1.066 iLCY i otai job cost: $810,116 <br />