My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-03_GENERAL DOCUMENTS - M1977036
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977036
>
2015-12-03_GENERAL DOCUMENTS - M1977036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 2:28:39 AM
Creation date
12/3/2015 11:51:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977036
IBM Index Class Name
General Documents
Doc Date
12/3/2015
Doc Name
IMP CLOSEOUT FILE
From
DRMS
To
DRMS
Email Name
SDT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> TRUCK/LOADER TEAM WORK <br /> .... <br /> PROJECT IDENTIFICATION <br /> Agency or organization name:Colorado Division Of Reclamation, Mining And Safety <br /> Task#: 001 State:Colorado Permit/job#:M-1977-036 <br /> Date: 1211612009 County:Weld abbreviation:none <br /> User: JLE Site:Greeley 35Th Avenue Mine Filename:M036-001 <br /> Permit or other job action Warranty Estimate <br /> Task description:Backfilling East Pit <br /> .... <br /> r7VVRLr C%A!Ul'lWC1Vl t per Jlllltudblb. 1 erdaY <br /> pwpmenTIIescn PT,on <br /> i i"iu IVGUeI tears.-i rucn:,Cat 775D(2002) <br /> -Loader:ICAT 992G <br /> Support equipment-Load area:NA <br /> -Dump area:NA <br /> Road maintenance-Motor grader:CAT 14H <br /> -Water truck:WaterTanker, 5,000Gal. <br /> Cost Breakdown : I <br /> ruck/Loader Work Team Support Equipment Road Maintenance Equipment <br /> Truck Loading Tool Load Area Dump Area Motor Grader lwaterTruck <br /> ;,,,Nul,ua:a G of ar,e., truck2 loader NA NA grader misctruk <br /> %Utilization-machine: 99 100 NA NA 20 20 <br /> -Ripper attachment: NA NA NA NA 0 NA <br /> Ownership cost/hour: $63.42 $180.33 NA NA $41.79 $24.58 <br /> Operating cost/hour: $95.95 $153.73 NA NA $9.71 $7.29 <br /> Ripper op.cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour] $25.88 $38.72 NA NA $38.91 $38.70 <br /> Unit subtotais:' $185.25 $372.78 NA NA $90.41 $70.57 <br /> Number of units: 4 1 0 0 1 1 <br /> Grouo subtotals: Work: $1,113.78 Su000rt: $0.00 Maintenance: $160.98 <br /> Total work team cost/hour: $1,274.76 <br /> mA 1 CKIAL CtuAimf iT ICJ <br /> Initial Swell Loose <br /> 760,000 LCY NA 760,000 <br /> Source of quantity take-off:Exhibit L,Adequacy Review#2 Response _ <br /> Source of estimated swell factor:NA <br /> Material purchase cost: $0.00 /LCY Total cost: $0 <br /> _....: .:. .:....... <br /> .. .. ... ... <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Trllrk Pnvinwil(wPinht)RPOR Tmrk Re(1(vnlume)Rasic <br /> _.._. .. :, 2,800 Vic_... ._ _. ___ .__ _ 41.80 <br /> Descr. :Clay-Natural bed Heaped volume: 54.80 LCY <br /> Rated payload: 139,740 pounds Average volume: 48.30 LCY <br /> Payload capacity: 49.91 LCY Adjusted volume*: 49.91 LCY <br /> Final truck volume based on number of loader passes: 34.10 LCY <br /> 'truck volume adjusted to not exceed rated payload or heaped volume <br /> Logging i ooi capacity: ioo conamon t;orrections: ,>Ite aitituae(tt.): 4,670 <br /> Rated capacity(nom. heaped): 15.500 LCY I Truck Loader Source <br /> Descr. :Other-rock/dirt mixtures (100-120%) Altitude adj. : 1.000 1.000 (Cat HB) <br /> Bucket fill factor 1.100 Job efficiencv:l 0.830 1 0.830 1(1 shift/day) <br /> Adjusted bucket capacity 17.050 LCY Net correction:I 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.