My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-03_GENERAL DOCUMENTS - M1977036
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977036
>
2015-12-03_GENERAL DOCUMENTS - M1977036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 2:28:39 AM
Creation date
12/3/2015 11:51:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977036
IBM Index Class Name
General Documents
Doc Date
12/3/2015
Doc Name
IMP CLOSEOUT FILE
From
DRMS
To
DRMS
Email Name
SDT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> HYDRAULIC EXCAVATOR WORK <br /> .. <br /> PROJECT IDENTIFICATION <br /> Task# : 01A State:Colorado Permit/job#:M-1977-036 <br /> Date : 1211612009 County:Weld Abbreviation :none <br /> User: JLE Site :Greeley 35Th Avenue Mine Filename:M036-01A <br /> Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br /> Permit or other job action :Warranty Estimate _ <br /> Task description :Excavating clay lens for reclamation fill <br /> HOURLY EQUIPMENT COST <br /> Machine description :Cat 365B L Series 11(2005) Horsepower:— 404 <br /> Weight(MT) : 70.25 <br /> Cost Breakdown : Utilization% <br /> Ownership cost/hour: $76.39 NA Shift basis : 1 per day <br /> Operating cost/hour: $113.63 100 Data source : (CRG) <br /> Operator cost/hour: $38.72 NA <br /> Total unit cost/hour: $228.74 Total fleet cost/hour: $457.48 <br /> . .... ...... .. .... <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 1,197,733 BCY factor: 1.220 volume : 1,461,234 LCY <br /> Source of estimated volume :Exhibit L,Adequacy Review Response#2 and Division Estimate <br /> Source of estimated swell factor:CAT Handbook <br /> HOURLY PRODUCTION <br /> Excavator Cycle Time(load bucket swing loaded, dump bucket, swing empty) <br /> Basic job condition description : AVERAGE <br /> Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.38 minutes <br /> Bucket Capacity <br /> Rated bucket capacity: 6.90 LCY(heaped) Bucket size class : large <br /> Bucket fill factor: 0.85 Hard, tough clay(80%-9061) <br /> Adjusted bucket capacity : 5.87 LCY <br /> Job Condition Correction Factors Source <br /> Site altitude : 4,670 feet Altitude adjustment: 1.00 (Cat HB)_ <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br /> Unadjusted hourly unit production :_ 926.05 LCY/hour <br /> Adjusted hourly unit production : 768.62 LCY/hour <br /> Adjusted hourly fleet production : 1537.25 LCY/hour <br /> JOB TIME AND COST <br /> Fleet size : 2 excavator(s) Total job time : 950.55 hours <br /> Unit cost : $0.298 per LCY Total job cost: $434,861 <br />
The URL can be used to link to this page
Your browser does not support the video tag.