Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> TRUCK/LOADER TEAM WORK <br /> PROJECT IDENTIFICATION <br /> Agency or organization name:Colorado Division Of Reclamation, Mining And Safety <br /> Task#: 002 State:Colorado Permit/job#:M-1977-036 <br /> Date: 12/16/2009 County:Weld Abbreviation:none <br /> User: JLE Site:Greeley 35Th Avenue Mine Filename:M036-002 <br /> Permit or other job action:Warranty Estimate <br /> Task description:Backfilling South Central Pits <br /> .... <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck/loader team-Truck:Cat 775D(2002) <br /> -Loader:CAT 992G <br /> Support equipment-Load area:NA <br /> -Dump area:NA <br /> Road maintenance-Motor grader:CAT 14H <br /> -Water truck:Water Tanker, 5,000 Gal. <br /> Cost Breakdown : Truck/Loader Work Team Support Equipment Road Maintenance Equipment <br /> Truck I Loading Tool Load Area Dump Area Motor Grader Water Truck <br /> Import data filename: truck2 loader NA NA grader misctruk <br /> %Utilization-machine: 100 100 NA NA 20 20 <br /> -Ripper attachment: NA NA NA NA 0 NA <br /> Ownership cost/hour: $63.42 $180.33 NA NA $41.79 $24.58 <br /> Operating cost/hour: $96.21 $153.73 NA NA $9.71 $7.29 <br /> Ripper op.cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour: $25.88 $38.72 NA NA $38.91 $38.70 <br /> Unit subtotals: $185.50 $372.78 NA NA $90.41 $70.57 <br /> Number of units E 6 2 0 0 1 1 <br /> Group subtotals:1 Work: $1,858.58 Support: $0.00 Maintenance: $160.98 <br /> Total work team cost/hour: $2,019.56 <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume: 701,235 LCY factor: NA volume: 701,235 LCY <br /> Source of quantity take-off:Exhibit L,Adequacy Review#2 Response <br /> Source of estimated swell factor:NA <br /> Material purchase cost: $0.00 /LCY Total cost: $0 <br /> ........... ............. .... <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: Truck Bed(volume)Basis: <br /> Material weight: 2,800 pounds/LCY Struck volume: 41.80 LCY <br /> Descr. :Clay-Natural bed Heaped volume: 54.80 LCY <br /> Rated payload: 139,740 pounds Average volume: 48.30 LCY <br /> Payload capacity: 49.91 LCY Adjusted volume*: 49.91 LCY <br /> Final truck volume based on number of loader passes: 34.10 LCY <br /> "truck volume adjusted to not exceed rated payload or heaped volume <br /> Loading Tool Capacity: Job Condition Corrections: Site altitude(ft.): 4,670 _ <br /> Rated capacity(nom. heaped): 15.500 LCY Truck Loader Source <br /> Descr. :Other-rock/dirt mixtures (100-12091o) Altitude adj. :1 1.000 1.000 (Cat HB) <br /> Bucket fill factor: 1.100 Job efficiency: 0,830 0.830 (1 shift/day) <br /> Adjusted bucket capacity: 17.050 LCY Net correction:1 0.830 0.830 <br />