My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-23_GENERAL DOCUMENTS - C1982056
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982056
>
2015-11-23_GENERAL DOCUMENTS - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:49 PM
Creation date
11/23/2015 10:47:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
11/23/2015
Doc Name
Midterm Review No. 7 & Cost Estimate (MT7)
From
DRMS
To
Twentymile Coal Company, Inc
Permit Index Doc Type
Findings
Email Name
JLE
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
155 <br />156 <br />157 <br />158 <br />159 <br />160 <br />161 <br />162 <br />163 <br />164 <br />165 <br />166 <br />167 <br />168 <br />169 <br />170 <br />171 <br />172 <br />173 <br />174 <br />175 <br />176 <br />177 <br />178 <br />179 <br />180 <br />181 <br />182 <br />185 <br />190 <br />Replace Topsoil on Exploration Drill Pads for <br />Holes TWC001-007 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4.61 <br />$756.00 <br />$1,988.00 <br />$15,932.00 <br />$23,774.00 <br />$1,568.00 <br />$502.00 <br />$887.00 <br />$3,341.00 <br />$5,058.00 <br />$5,038.00 <br />$9,239.00 <br />$2,146.00 <br />$210.00 <br />$307.00 <br />$621.00 <br />$879.00 <br />$2,700.00 <br />$518.00 <br />$5,068.00 <br />$9,042.00 <br />$3,455.00 <br />$9,388.00 <br />$439.00 <br />$614.00 <br />$1,364.00 <br />$853.00 <br />$156,195.41 <br />$640,704.17 <br />$486,982.00 <br />$3,082,423.64 <br />Replace Topsoil on 15 Left Pad and Access Road <br />DOZER <br />9.52 <br />Replace Topsoil on 16LT Pad and Access Road <br />DOZER <br />76.26 <br />Replace Topsoil on 6 North Main Reservoir <br />Disturbances <br />DOZER <br />113.80 <br />Replace Topsoil on Northwest Mains Vent Pad <br />DOZER <br />7.51 <br />Replace Topsoil on Exploration Drill Pads for <br />Holes TCW008-012 <br />DOZER <br />2.41 <br />Replace Topsoil on Thickener Underflow Borehole <br />Area <br />DOZER <br />4.25 <br />Replace Topsoil on Refuse Clay Pile Staging Area <br />OSP-1 <br />DOZER <br />15.99 <br />Replace Topsoil on 19 Right Pad and Pipeline <br />Corridor <br />DOZER <br />24.21 <br />Replace Topsoil on 18 Left Pipeline Corridor <br />DOZER <br />24.11 <br />Replace Topsoil on 18 Left Pad and Access Road <br />DOZER <br />44.22 <br />Replace Topsoil on 18 Right Pad <br />LOADER <br />15.82 <br />Replace Topsoil, DrillPad/MudPit; EMD Water <br />Mon. Wells M267 <br />DOZER <br />0.98 <br />Replace Topsoil on Access Roads; EMD Water <br />Mon. Wells MR267 <br />DOZER <br />1.42 <br />Replace Topsoil, Roads/Pads-, TRO Coal Qual. <br />Coreholes MR269 <br />DOZER <br />2.89 <br />Replace Topsoil; 7RT Thickener BH Pad/Pipeline <br />Corr.; MR270 <br />DOZER <br />4.08 <br />Topsoil Drill Pads/Access Roads TRO Coal Q. <br />Coreholes 5-10 <br />DOZER <br />12.54 <br />Topsoil Drill Pads/Access Road; WCR Coreholes <br />MR275 <br />DOZER <br />2.41 <br />Replace Topsoil on Drill Pads and Access Road <br />DOZER <br />23.54 <br />Topsoil Drill Pad/Additional Dist. WCR Sup. <br />Coreholes MR277 <br />DOZER <br />42.00 <br />Topsoil Drill Pads/Access Road; WCR Sup. <br />Coreholes MR278 <br />DOZER <br />16.05 <br />Topsoil Drill Pads/Access Road; WCR Offset <br />Drilling; MR280 <br />DOZER <br />43.61 <br />Topsoil from Stockpile to Drill Pad; 5MN <br />Borehole MR283 <br />DOZER <br />1.66 <br />Topsoil from Stockpile to Light-Use Road; 5MN <br />Borehole MR283 <br />DOZER <br />2.32 <br />Topsoil on Drill Pad; 10 East Mid Panel BH; <br />MR289 <br />DOZER <br />6.33 <br />Replace Topsoil on New CRDA Access Road; <br />MR290 <br />DOZER <br />3.25 <br />PortallShaft Sealing <br />Seal Shafts and Openings <br />MINESEAL <br />94.87 <br />Drillhole/Monitoring Well Sealing <br />Borehole and Monitoring Well Sealing <br />BOREHOLE <br />899.72 <br />Revegetation and Reseeding <br />Rangeland Area Seeding; All approved <br />disturbances <br />REVEGE <br />646.30 <br />Structural Demolition and Removal <br />Demolish and Remove All Structures <br />DEMOLISH <br />4,002.00 <br />Equipment Mobilization/Demobilization <br />
The URL can be used to link to this page
Your browser does not support the video tag.