My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-23_GENERAL DOCUMENTS - C1982056
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982056
>
2015-11-23_GENERAL DOCUMENTS - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:49 PM
Creation date
11/23/2015 10:47:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
11/23/2015
Doc Name
Midterm Review No. 7 & Cost Estimate (MT7)
From
DRMS
To
Twentymile Coal Company, Inc
Permit Index Doc Type
Findings
Email Name
JLE
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />106 <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />130 <br />131 <br />132 <br />133 <br />134 <br />135 <br />136 <br />137 <br />138 <br />139 <br />140 <br />141 <br />142 <br />143 <br />144 <br />145 <br />146 <br />147 <br />148 <br />149 <br />150 <br />151 <br />153 <br />154 <br />Rip New CRDA Topsoil Stockpile Access Road; <br />MR290 <br />RIPPER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.82 <br />$222.00 <br />$2,269.00 <br />$980.00 <br />$1,650.00 <br />$1,963.44 <br />$1,495.00 <br />$167.00 <br />$2,606.00 <br />$6,833.00 <br />$7,687.00 <br />$5,978.00 <br />$9,447.00 <br />$11,809.00 <br />$837.00 <br />$12,327.00 <br />$2,777.00 <br />$79,427.00 <br />$81,718.00 <br />$107,126.00 <br />$1,672.00 <br />$638,356.00 <br />$96,673.00 <br />$14,991.00 <br />$5,857.00 <br />$71,970.00 <br />$5,160.00 <br />$12,210.00 <br />$5,050.00 <br />$3,607.00 <br />$2,267.00 <br />$668.00 <br />$699.00 <br />$379,000.00 <br />$10,798.00 <br />$42,179.00 <br />$16,948.00 <br />$2,355.00 <br />$15,647.00 <br />$9,588.00 <br />$1,337.00 <br />Earthwork -Drainage Control <br />Regrade Ditch D-3 <br />DOZER <br />2924 <br />Regrade Ditch E-1 <br />DOZER <br />12.63 <br />Regrade Ditch F-1 and Pond F Ditches <br />DOZER <br />2126 <br />Regrade Ditches G -la, G -lb, G -lc, and Million <br />Gallon Tank No <br />DOZER <br />25.90 <br />Regrade Ditch G-4 <br />DOZER <br />19.27 <br />Regrade West Rail Loop Diversion Ditch <br />DOZER <br />2.15 <br />Backfill and Regrade Pond B <br />DOZER <br />7.61 <br />Backfill and Regrade Pond C <br />DOZER <br />19.94 <br />Backfill and Regrade Pond D <br />DOZER <br />22.43 <br />Backfill and Regrade Pond E <br />DOZER <br />17.45 <br />Backfill and Regrade Pond F <br />DOZER <br />27.57 <br />Backfill and Regrade Pond G <br />DOZER <br />34.46 <br />Backfill and Regrade Pond T <br />DOZER <br />2.44 <br />Backfill and Regrade 6 North Main Holding Pond <br />Embankments, <br />DOZER <br />35.97 <br />Backfill and Regrade 18 Left Vent Shaft Ponds <br />DOZER <br />8.10 <br />Earthwork - Topsoil <br />Replace Topsoil at Portal Surface Area <br />SCRAPERI <br />38.43 <br />Replace Topsoil at OfficeBathouse <br />SCRAPERI <br />39.54 <br />Replace Topsoil at Parking Lot and La down Area <br />SCRAPERI <br />51.83 <br />Replace Topsoil at Stoker Coal Loading Area <br />SCRAPERI <br />1.29 <br />Replace Topsoil at Refuse Area, Refuse Area <br />Expansion Phase <br />SCRAPERI <br />275.49 <br />Replace Topsoil on Haulroad B <br />SCRAPERI <br />62.69 <br />Replace Topsoil on Fish Creek Borehole Area and <br />Road <br />SCRAPERI <br />9.72 <br />Replace Topsoil on Explosives Storage Area <br />SCRAPERI <br />4.54 <br />Replace Topsoil on Truck Loadout and Haulroad C <br />SCRAPERI <br />55.72 <br />Replace Topsoil on Pond E and Haulroad B <br />SCRAPERI <br />4.00 <br />Replace Topsoil on Pond E Relocation Area <br />SCRAPERI <br />9.45 <br />Replace Topsoil on Batch /Weigh Loadout <br />Stockpile Area <br />SCRAPERI <br />3.91 <br />Replace Topsoil on 18 Right West Portion Access <br />Road <br />SCRAPERI <br />3.23 <br />Replace Topsoil on 18 Right East Central Portion <br />Access Road <br />SCRAPERI <br />2.03 <br />Replace Topsoil on 18 Right Northeast Portion <br />Access Road <br />SCRAPERI <br />0.60 <br />Replace Topsoil on West Haulroad <br />SCRAPERI <br />0.63 <br />Replace Cover Material on Refuse Disposal Area <br />SCRAPERI <br />122.56 <br />Replace Topsoil on Main Facilities <br />Access/Haulroad Area <br />SCRAPERI <br />7.00 <br />Haul and Replace Topsoil to Fish Creek Tipple <br />TRUCKI <br />31.01 <br />Haul and Replace Topsoil to "Trudy's Corner" <br />Laydown Area <br />TRUCKI <br />12.46 <br />Replace Topsoil on 10 Right Dewatering Borehole <br />DOZER <br />14.35 <br />Replace Topsoil on Eastern Mining District Vent <br />Shaft Area <br />DOZER <br />95.34 <br />Replace Topsoil on 6 North Main Vent Shaft Pad <br />and Access Ro <br />DOZER <br />58.42 <br />Replace Topsoil on 16 Left Pad and Access Road <br />DOZER <br />8.15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.