<br />Regrade Riser Area; 5MN Pipeline MR288
<br />GRADER
<br />1
<br />1
<br />1
<br />2
<br />2
<br />1
<br />2
<br />2
<br />2
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />0.61
<br />$60.00
<br />$1,430.00
<br />$194.00
<br />$75,032.00
<br />$7,254.00
<br />$7,726.00
<br />$20,566.00
<br />$5,691.00
<br />$4,248.00
<br />$3,588.00
<br />$2,213.00
<br />$2,929.00
<br />$4,055.00
<br />$1,932.00
<br />$5,253.00
<br />$415.00
<br />$1,856.00
<br />$310.00
<br />$9,514.00
<br />$3,099.00
<br />$431.00
<br />$15,863.00
<br />$1,001.00
<br />$2,546.00
<br />$1,162.00
<br />$7,425.00
<br />$14,573.00
<br />$2,772.00
<br />$1,189.00
<br />$984.00
<br />$14,233.00
<br />$5,907.00
<br />$4,185.00
<br />$1,842.00
<br />Regrade Drill Pad/Mud Pit; 10 East -Mid Pan.
<br />Emergency MR289
<br />DOZER
<br />6.64
<br />Grade New CRDA Topsoil Pile Area and Access
<br />Road; MR290
<br />GRADER
<br />1.04
<br />Earthwork - Compaction
<br />Compact Coal Stockpile Footprints at Refuse Pile
<br />COMPACT
<br />181.24
<br />Compact Temporary Storage Refuse in Area 3
<br />COMPACT
<br />17.52
<br />Earthwork - Road Reclamation
<br />Regrade, Disperse Surfacing, and Rip Main Haul
<br />Road
<br />DOZER
<br />21.15
<br />Regrade, Disperse Surfacing, and Rip Haul Road B
<br />DOZER
<br />28.14
<br />Regrade, Disperse Surfacing, and Rip Haul Road C
<br />DOZER
<br />7.79
<br />Regrade, Disperse Surfacing, and Rip Shop Access
<br />Road
<br />DOZER
<br />5.81
<br />Regrade and Rip Explosives Storage Area Access
<br />Road
<br />DOZER
<br />9.82
<br />Regrade, Disperse Surfacing, and Rip Brown
<br />Palace Access Road
<br />DOZER
<br />6.06
<br />Regrade, Disperse Surfacing, and Rip Training
<br />Center Access
<br />DOZER
<br />8.02
<br />Regrade, Disperse Surfacing, and Rip Weigh
<br />Station Access
<br />DOZER
<br />11.10
<br />Regrade, Disperse Surfacing, and Rip Fish Creek
<br />Bore Access
<br />DOZER
<br />5.29
<br />Regrade, Disperse Surfacing, and Rip Fish Creek
<br />Tipp Access
<br />DOZER
<br />14.38
<br />Regrade and Rip Pond F Access Road
<br />DOZER
<br />1.14
<br />Regrade and Rip Equipment Storage Area and
<br />Access Road
<br />DOZER
<br />5.08
<br />Regrade and Rip Pond T Access Road
<br />DOZER
<br />0.85
<br />Regrade and Rip Wastewater Facility Ramp and
<br />Access Road
<br />DOZER
<br />26.04
<br />Regrade and Rip 6 North Main Ditches and Access
<br />Road
<br />DOZER
<br />8.48
<br />Regrade and Rip 16 Left Grout Borehole Access
<br />Road
<br />DOZER
<br />1.18
<br />Regrade and Rip 16LT Utility Borehole Access
<br />Road
<br />DOZER
<br />43.42
<br />Regrade and Rip 15LT Vent Shaft Access Road
<br />DOZER
<br />2.74
<br />Rip and Bulldoze Surface Material on Northwest
<br />Vent Shaft Pa
<br />DOZER
<br />6.97
<br />Rip West Haulroad Truck Scale and Ramp
<br />RIPPER
<br />3.18
<br />Remove Gravel Fill at Batch Weigh Haulroad
<br />TRUCKI
<br />7.04
<br />Load/Haul Northwest Main Vent Shaft Pad and
<br />Access Road Mate
<br />TRUCKI
<br />13.58
<br />Remove Gravel from 6 North Main Access Road
<br />TRUCKI
<br />3.90
<br />Remove Gravel from West Haulroad
<br />TRUCKI
<br />1.67
<br />Remove and Haul Parking Expansion Asphalt
<br />TRUCKI
<br />1.63
<br />Remove 18 Left Vent Shaft Pad, Substation and
<br />Access Road Ma
<br />TRUCKI
<br />11.53
<br />Remove Refuse Disposal Area Expansion
<br />Haulroad Base
<br />SCRAPERI
<br />5.28
<br />Regrade Access Roads; TRO Coal Quality
<br />Coreholes 5-10, MR272
<br />DOZER
<br />19.44
<br />Regrade Light -Use Road; 5MN Borehole MR283
<br />DOZER
<br />6.96