Laserfiche WebLink
200 <br />210 <br />Mobilize/Demobilize Equipment from Hayden, <br />Colorado <br />MOBILIZE <br />1 <br />1 <br />3.37 <br />$40,600.00 <br />$89,794.43 <br />Miscellaneous Reclamation Tasks <br />$87,728.75 <br />Job superintendent: <br />Site Maintenance During Reclamation and Ten- <br />Year Liability <br />SITEMAINT <br />ENANCE <br />300.00 <br />SUBTOTALS: <br />10742.69 <br />$8,355,119 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$168,773.40 <br />Performance bond: <br />1.05 <br />Total = <br />$87,728.75 <br />Job superintendent: <br />5,371.35 <br />Total = <br />$403,710.29 <br />Profit: <br />10.00 <br />Total = <br />$835,511.90 <br />TOTAL O & P = <br />$1,495,724.34 <br />CONTRACT AMOUNT (direct + O & P) = <br />$9,850,843.34 <br />III11W.11ItsIV1#1INNaR101MUWell XiruGVEWDIu1IV11 <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />0.00 <br />4.00 <br />3.13 <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $394,033.73 <br />$308,331.40 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $2,198,089.47 <br />TOTAL BOND AMOUNT (direct + indirect) = $10,553,208.47 <br />