My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-12_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2015-11-12_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 8:12:25 PM
Creation date
11/13/2015 3:35:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
11/12/2015
Doc Name
Correspondence Re: TR22
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR22
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39'-2" 40'-0 1/2" <br /> ELEVATED RCP PIPE SUPPORT <br /> TAILING PIPE TUBE AND WEDGES <br /> 9• <br /> r-• J'-3• r-r 4'-•3 L'-Y 3 r-3• -r J'_ r-3• r-3' r-• 3'-Y •_]• -0.3 <br /> 2 3 3 - - - - - - - - <br /> — — ---- — — — -- — — — <br /> I I I <br /> — <br /> oo <br /> W21x44 a <br /> i 3 IDO <br /> BEAM-TO-BEAM APPROXIMATE W21x48 J <br /> I X-BRACE FINAL GRADE <br /> o- a" w EXISTING BAR w <br /> o_ <br /> w o JOIST ABANDONED <br /> o F D_ IN PLACE <br /> ~ w <br /> 0 0 <br /> ti w <br /> a <br /> c� <br /> 4'-9" 35'-2 3/4" 39'-7 1/8" <br /> ELEVATED PIPE SUPPORTS, TOWER #4 <br /> S2.0 S2.4 NOTES. 1/8" = 1'-0" <br /> 1. PEDESTAL LOCATION DIMENSIONS LISTED WERE PROVIDED <br /> TO BAUR BY PRECISION INDUSTRIAL CONTRACTORS. <br /> 2. BEAM LENGTH, LOCATIONS OF PIPE SUPPORT TUBES AND <br /> BEAM-TO-BEAM X-BRACES ARE BASED ON THE STEEL <br /> FABRICATION SHOP DRAWINGS PREPARED BY CRITICAL <br /> PATH METALWORKS, DATED 08/25/14, IDENTIFIED AS <br /> SUBMITTAL 5. <br /> DWG.NO. REFERENCE DRAWINGS I IDESCRip-nONOFREVISON DATE I BY VENTILATION I I ENGR: JLK 2-28-14CIfmAXIVIOIenUnl HENDERSON MILL <br /> MECHANICAL DRAWN BY: JP 2-2&4 TAILINGS DELIVERY LINE <br /> 4 lRECORD SET OF CONSTRUCTION COMPLETED IN 2015 0803-15 JU( STRUCTURAL CHECKED BV: JCB 2-28.14 A i/1ip0/14CAbRM COTPIIIy <br /> ELECTRICAL APPROVED BV: E.E••�-- ELEVATION AT TOWER#4 <br /> PIPING APPROVED BY: BAUR 6LIASSUC:IATES <br /> SCALE: �AS OTHER APP BY: ��°� PROD.NO.13024 SHT S2A REV. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.