Laserfiche WebLink
39'-1 3/4" 40'-5 1/2" <br /> FSLID IN BEAM FLANGE WASH ELEVATED RCP PIPE SUPPORT <br /> I TORCH CUT I TAILING PIPE TUBE & WEDGES <br /> I-GRIND SURFACE SMOOTH I <br /> I-INSTALL 1/4"x2"x2" I o <br /> PLATE WASHER ° <br /> L——————— —— -r ]•-o: r-•: -r 3•-r r-0 x-r r-s 3— r-r r-r a r-r ra r-r r-r ra ra r. s-r r-r 3-10 r-r ram: <br /> ri T! <br /> i I I <br /> II - - -- -- - - - - - - - -217 - -- - - - - <br /> I \ W21x44 ` <br /> � BEAM^-TO-BEAM z- APPROXIMATE EXISTING BAR <br /> X-BRACE FINAL GRADE JOIST ABANDONED <br /> H IN PLACE <br /> d N <br /> W <br /> H C� uj <br /> ci w a <br /> 0 0 <br /> ILL: W <br /> a <br /> 4'-8 1/4" 35'-3 1/2" 40'-0" <br /> ELEVATED PIPE SUPPORTS, TOWER #3 <br /> S2.0 S2.3 NOTES: <br /> 1. PEDESTAL LOCATION DIMENSIONS LISTED WERE PROVIDED <br /> TO BAUR BY PRECISION INDUSTRIAL CONTRACTORS. <br /> 2. BEAM LENGTH, LOCATIONS OF PIPE SUPPORT TUBES AND <br /> BEAM-TO-BEAM X-BRACES ARE BASED ON THE STEEL <br /> FABRICATION SHOP DRAWINGS PREPARED BY CRITICAL <br /> PATH METALWORKS, DATED 08/25/14, IDENTIFIED AS <br /> SUBMITTAL 5. <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION GATE I BY VENTILATION ENGR: JLKI 2-28-1/ PM AA,-- HENDERSON MILL <br /> MECHANICAL DRAWN BV: JP a28-14 TAILINGS DELIVERY LINE <br /> 4 RECORD SET OF CONSTRUCTION COMPLETED IN 2015 09-03-15 JLK STRUCTURAL CHECKED BV: JCB 2-2M4 A F/"PWN/Cl CO�IpYIy <br /> E"vinE/ m�ptMo <br /> ELECTRICAL APPROVED er: r�-1 ELEVATION AT TOWER#3 <br /> PIPING APPROVED BY, SAUR&ASSO(:IATES <br /> SCALE: AS NDTFDI OTHER APR BY: -�KSI-TIvr.FN,IN 6l R PROJ.NO.13024 ISHT S2.3 REV. 4 <br />