My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-12_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2015-11-12_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 8:12:25 PM
Creation date
11/13/2015 3:35:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
11/12/2015
Doc Name
Correspondence Re: TR22
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR22
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39'-1 3/4" 40'-5 1/2" <br /> FSLID IN BEAM FLANGE WASH ELEVATED RCP PIPE SUPPORT <br /> I TORCH CUT I TAILING PIPE TUBE & WEDGES <br /> I-GRIND SURFACE SMOOTH I <br /> I-INSTALL 1/4"x2"x2" I o <br /> PLATE WASHER ° <br /> L——————— —— -r ]•-o: r-•: -r 3•-r r-0 x-r r-s 3— r-r r-r a r-r ra r-r r-r ra ra r. s-r r-r 3-10 r-r ram: <br /> ri T! <br /> i I I <br /> II - - -- -- - - - - - - - -217 - -- - - - - <br /> I \ W21x44 ` <br /> � BEAM^-TO-BEAM z- APPROXIMATE EXISTING BAR <br /> X-BRACE FINAL GRADE JOIST ABANDONED <br /> H IN PLACE <br /> d N <br /> W <br /> H C� uj <br /> ci w a <br /> 0 0 <br /> ILL: W <br /> a <br /> 4'-8 1/4" 35'-3 1/2" 40'-0" <br /> ELEVATED PIPE SUPPORTS, TOWER #3 <br /> S2.0 S2.3 NOTES: <br /> 1. PEDESTAL LOCATION DIMENSIONS LISTED WERE PROVIDED <br /> TO BAUR BY PRECISION INDUSTRIAL CONTRACTORS. <br /> 2. BEAM LENGTH, LOCATIONS OF PIPE SUPPORT TUBES AND <br /> BEAM-TO-BEAM X-BRACES ARE BASED ON THE STEEL <br /> FABRICATION SHOP DRAWINGS PREPARED BY CRITICAL <br /> PATH METALWORKS, DATED 08/25/14, IDENTIFIED AS <br /> SUBMITTAL 5. <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION GATE I BY VENTILATION ENGR: JLKI 2-28-1/ PM AA,-- HENDERSON MILL <br /> MECHANICAL DRAWN BV: JP a28-14 TAILINGS DELIVERY LINE <br /> 4 RECORD SET OF CONSTRUCTION COMPLETED IN 2015 09-03-15 JLK STRUCTURAL CHECKED BV: JCB 2-2M4 A F/"PWN/Cl CO�IpYIy <br /> E"vinE/ m�ptMo <br /> ELECTRICAL APPROVED er: r�-1 ELEVATION AT TOWER#3 <br /> PIPING APPROVED BY, SAUR&ASSO(:IATES <br /> SCALE: AS NDTFDI OTHER APR BY: -�KSI-TIvr.FN,IN 6l R PROJ.NO.13024 ISHT S2.3 REV. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.