Laserfiche WebLink
39'-2" 40'-5" <br /> ELEVATED RCP PIPE SUPPORT <br /> TAILING PIPE TUBE & WEDGES <br /> 9' <br /> V-5'2 3'-3' 3'-3' 3'-S 3'-J S_P X-r A-T S-3- 3'-3- 4'-3't 4'-Y 3 2'-5'3 4'-OY X—r X-r 3'-11't Y-73 S-3' Y-3' 3'-3' 3'-3't <br /> I <br /> i <br /> N (V _ _ <br /> V. W21x44 <br /> —— H 00 a. W21 x48 <br /> N APPROXIMATE EXISTING BAR <br /> FINAL GRADE JOIST ABANDONED <br /> ui <br /> a IN PLACE r N N <br /> W <br /> O Wp W <br /> LL W c- <br /> o_ <br /> 4'-8 3/4" 35-3 1/4" 39'-1 3/8" <br /> n ELEVATED PIPE SUPPORTS, TOWER #2 <br /> S2.0 S2.2 NOTES: 1/8'. = 1'-0" <br /> 1. PEDESTAL LOCATION DIMENSIONS LISTED WERE PROVIDED <br /> TO BAUR BY PRECISION INDUSTRIAL CONTRACTORS. <br /> 2. BEAM LENGTH, LOCATIONS OF PIPE SUPPORT TUBES AND <br /> BEAM—TO—BEAM X—BRACES ARE BASED ON THE STEEL <br /> FABRICATION SHOP DRAWINGS PREPARED BY CRITICAL <br /> PATH METALWORKS, DATED 08/25/14, IDENTIFIED AS <br /> SUBMITTAL 5. <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY VENTILATION I IENGR: JLK I 2.2iW4 ClfmaXMO/y�denum HENDERSON MILL <br /> MECHANICAL DRAWN BY: JP 248-14 TAILINGS DELIVERY LINE <br /> 4 RECORD SET OF CONSTRUC770N COMPLETED IN 2015 09-03-15 JLK STRUCTURAL CHECKED BV: JCe 2-28.1a A Ffe6(W/f-MCMORM COTpMy <br /> ELECTRICAL APPROVEDBV: a"%"e+vu+saroneoo >o> ELEVATION AT TOWER#2 <br /> PIPING APPROVED BV: BAUR&ASSOCIATES <br /> SCALE: AS NOTE OTHER APP BV: =ona+i.Tlvr,EV,11nfERt pROJ.NO.13024 ISM S22 I REV. 4 <br />