Laserfiche WebLink
39'-2" 40'-4 3/8" <br /> ELEVATED RCP PIPE SUPPORT <br /> TAILING PIPE TUBE AND WEDGES <br /> 1-0• - - - - - 6.2 - - - - - 6•f r <br /> - <br /> ( <br /> I — — —— —71 <br /> — — — _ _ — — — —— _— <br /> _ —_ — _—__ — _ — __ — —— — ———— — <br /> BEAM—TO—BEAM <br /> _ 0 X—BRACE <br /> O W21 x44 <br /> APPROXIMATE W21x48 <br /> 0 I FINAL GRADE <br /> w <br /> � 0 <br /> w EXISTING BAR a <br /> n o JOST ABANDONED c:,j <br /> IN PLACE <br /> c <br /> Ld J...i <br /> � <br /> o F BACKFILLED WITH <br /> E7 w FLOW FILL <br /> d 0 <br /> Ll w <br /> D_ <br /> 4'-9 1/2" rj 35'-2 5/8" 39'-11" <br /> n ELEVATED PIPE SUPPORTS, TOWER #1 <br /> 52.0 S2.1 NOTES 1/8" = 1'—O" <br /> 1. PEDESTAL LOCATION DIMENSIONS LISTED WERE PROVIDED <br /> TO BAUR BY PRECISION INDUSTRIAL CONTRACTORS. <br /> 2. BEAM LENGTH, LOCATIONS OF PIPE SUPPORT TUBES AND <br /> BEAM—TO—BEAM X—BRACES ARE BASED ON THE STEEL <br /> FABRICATION SHOP DRAWINGS PREPARED BY CRITICAL <br /> PATH METALWORKS, DATED 08/25/14, IDENTIFIED AS <br /> SUBMITTAL 5. <br /> DWG.NO. REFERENCEDRAWINGS DESCRIPTION OFREVISION DATE BY VENTILATION I I ENGR: JUKI 2.28-14 HENDERSON MILL <br /> MECHANICAL DRAWN By <br /> JP 2-26-14 ; ClimaxMNPROJ. <br /> lbd <br /> 4 RECORD SET OF CONSTRUCTION COMPLETED IN2015 09-03-15 JLK STRUCTURAL CHECKED BY: JCB 2-28-14 AfnafahYeMOR TAILINGS DELIVERY LINE <br /> ELECTRICAL APPROVED BY: eu ELEVATION AT TOWER#1 <br /> PIPING APPROVED BV: BAUR&ASCALE: AS NOTED OTHER APP BY: . NO.13024 SHT S2.1 REV. d <br />