Laserfiche WebLink
HANGER RODS HAVE PARTIAL <br /> INUT ENGAGEMENT I <br /> I-IF BOLT ENGAGES LESS THAN <br /> IONE FULL NUT, INSTALL WELDED <br /> CHANNEL PARALLEL TO ROD <br /> ELEVATED RCP PIPE SUPPORT <br /> TAILING PIPE TUBE AND WEDGES <br /> 9' _ <br /> 2•-3•L 3'-Y 3•-3• Y-3• Y-3• S'-J• 4'-3• -3• r• ' V-Y Ya•S 4'-3•! Y-IT• Y-3• Y-3• 31-3• 3'-3• '-3• Y-J• 3'-3• 3'-J' Y�l• 3'-JY <br /> i I <br /> — — <br /> 00 <br /> B ;4 EAM TO—BEAM "l <br /> 3 I X—BRACE <br /> W21 x48 <br /> W2I x44 cJ w <br /> a �,a i✓cz';.'c s mac}`,. r o <br /> x v+s <br /> APPROXIMATE a <br /> rw " o FINAL GRADE EXISTING BAR <br /> o <br /> F a JOIST ABANDONED <br /> I w c� IN PLACE <br /> 0 0 <br /> w <br /> D_ <br /> 4'-9" 35'-2 1/2" 39'-11 1/2" <br /> ELEVATED PIPE SUPPORTS, TOWER #5 <br /> S2.D S2.5 NOTES: 1/8'. <br /> 1. PEDESTAL LOCATION DIMENSIONS LISTED WERE PROVIDED <br /> TO BAUR BY PRECISION INDUSTRIAL CONTRACTORS. <br /> 2. BEAM LENGTH, LOCATIONS OF PIPE SUPPORT TUBES AND <br /> BEAM—TO—BEAM X—BRACES ARE BASED ON THE STEEL <br /> FABRICATION SHOP DRAWINGS PREPARED BY CRITICAL <br /> PATH MEfALWORKS, DATED 08/25/14, IDENTIFIED AS <br /> SUBMITTAL 5. <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY VENTILATION I I ENGR: JLK 2-25-14 p3^82—Molybdenum HENDERSON MILL <br /> MECHANICAL DRAWN BY: JP 2-2B-14 TAILINGS DELIVERY LINE <br /> 4 RECORD SET OF CONSTRUCTION COMPLETED IN 2015 09-03-15 JLK STRUCTURAL CHECKED BY: 'CB 2-28-14 A RfIPQOR'WChftRM Compmy <br /> ELECTRICAL APPROVED BY: ,wJ'"u.caaxwo ELEVATION AT TOWER#5 <br /> PIPING APPROVED BY: ttAUR 6t ASSOCIATES <br /> SCALE: AS NOTED OTHER APP BY: (:n 1.a,:tT,�c Isro,r.r.e t+ PROD.NO.13024 ISHT S2.5 I REV. 4 <br />