My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-28_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-10-28_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:01 PM
Creation date
10/28/2015 10:12:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
10/28/2015
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
MR290
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> <br />Task description: Rip New CRDA Topsoil Stockpile Access Road <br /> <br />Site: Foidel Creek Mine Permit Action: MR290 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br /> <br /> <br />Task #:001State:ColoradoAbbreviation:None <br /> <br />Date:10/28/2015County:RouttFilename:C056-001 <br /> <br />User:JLE <br /> <br />: <br />Agency or organization nameDRMS <br /> <br />HOURLY EQUIPMENT COST <br /> <br />Basic Machine: Cat D9T - 9SU Horsepower: 405 <br />Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> <br /> <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $81.10 NA <br />Operating Cost/Hour: $143.16 100 <br />Ripper Operating Cost/Hour: $8.91 100 <br />Operator Cost/Hour: $38.01 NA <br /> <br />Total Unit Cost/Hour: $271.17 <br /> <br />Total Fleet Cost/Hour: $271.17 <br /> <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br /> <br /> <br />Alternate Methods: <br /> <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 0.60 acres Rip Depth (ft): 1.00 Volume: 968 BCY or CCY <br /> <br />Source of estimated quantity: MR290 Application <br /> <br />HOURLY PRODUCTION <br /> <br /> <br />Seismic: <br />Seismic Velocity: NA feet/second <br /> <br />Area: <br />Average Ripping Depth: 2.63 mph <br />Average Ripping Width: 7.67 degrees <br />Average Ripping Length: 400.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.881 acres/hour <br /> <br />Job Condition Correction Factors <br /> <br />Unadjusted Hourly Unit Production: 0.881 Acres/hr <br /> <br />Site Altitude: 6,900 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br /> <br />Adjusted Hourly Unit Production: 0.73 Acres/hr <br />Adjusted Hourly Fleet Production: 0.73 Acres/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Grader(s) Total job time: 0.82Hours <br /> <br /> <br />Unit cost: $370.744 Per acre Total job cost: $222 <br /> <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.