Laserfiche WebLink
COST SUMMARY WORK <br /> <br />Task description: Reclaim New CRDA Topsoil Stockpile Area and Access Road <br /> <br />Site: Foidel Creek Mine Permit Action: MR290 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br /> <br /> <br />Task #:000State:ColoradoAbbreviation:None <br /> <br />Date:10/28/2015County:RouttFilename:C056-000 <br /> <br />User:JLE <br /> <br />: <br />Agency or organization nameDRMS <br /> <br />TASK LIST (DIRECT COSTS) <br /> <br /> Form Fleet <br />Task <br />Task <br />Hours Cost <br />Description Used Size <br />001 Rip New CRDA Topsoil Stockpile Access Road RIPPER 1 0.82 $222.00 <br />002 Replace Topsoil on New CRDA Access Road DOZER 1 3.25 $853.00 <br />003 Grade New CRDA Topsoil Pile Area and Access GRADER 1 1.04 $194.00 <br />Road <br />004 Revegetation of New CRDA Topsoil Pile and REVEGE 1 5.20 $1,184.00 <br />Access Road <br /> <br />10.31 $2,453 <br /> SUBTOTALS: <br /> <br /> <br />INDIRECT COSTS <br /> <br />OVERHEAD AND PROFIT: <br /> <br />Liability insurance: 2.02 Total = $49.55 <br />Performance bond: 1.05 Total = $25.76 <br />Job superintendent: 5.16 Total = $387.45 <br />Profit: 10.00 Total = $245.30 <br /> TOTAL O & P = $708.06 <br /> CONTRACT AMOUNT (direct + O & P) = $3,161.06 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br /> <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 Total = $134.35 <br />Reclamation management and/or administration: 5.00 $158.05 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $1,000.46 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) =$3,453.46 <br /> <br /> <br /> <br />CIRCES Cost Estimating Software <br />