Laserfiche WebLink
BULLDOZER WORK <br /> <br />Task description: Replace Topsoil on New CRDA Access Road <br /> <br />Site: Foidel Creek Mine Permit Action: MR290 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br /> <br /> <br />Task #:002State:ColoradoAbbreviation:None <br /> <br />Date:10/28/2015County:RouttFilename:C056-002 <br /> <br />User:JLE <br /> <br /> <br />: DRMS <br />Agency or organization name <br /> <br />HOURLY EQUIPMENT COST <br /> <br /> <br />: Cat D9T - 9SU <br />Basic Machine <br /> <br />Horsepower:405 <br /> <br />Blade Type:Semi-Universal <br /> <br />Attachment: 3-shank ripper <br /> <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> <br />Cost Breakdown: <br /> Utilization % <br /> <br />Ownership Cost/Hour:$81.10NA <br /> <br />Operating Cost/Hour:$143.16100 <br /> <br />Ripper op. Cost/Hour:$0.000 <br /> <br />Operator Cost/Hour:$38.01 <br />NA <br /> <br />Total unit Cost/Hour: $262.26 <br />Total Fleet Cost/Hour: $262.26 <br /> <br />MATERIAL QUANTITIES <br /> <br />Initial Volume: 2,614 <br />Swell factor: 1.000 <br />2,614 <br />Loose volume: LCY <br /> <br />Source of estimated volume: DRMS Estimate; depth via Map 17. Soil Unit 35E <br /> <br />Source of estimated swell Cat Handbook <br />factor: <br /> <br />HOURLY PRODUCTION <br /> <br /> <br />Average push distance: 175 feet <br /> <br />Unadjusted hourly 805.3 LCY/hr <br />production: <br /> <br />Materials consistency Consolidated stockpile 1.0 <br />description: <br /> <br />Average push -5 % <br />gradient: <br />Average site altitude: 6,900 feet <br /> <br />Material weight: 1,600 lbs/LCY <br /> <br />Weight description: Top Soil <br /> <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />