Laserfiche WebLink
L. As -Built Conditions <br />1. A report will be submitted to the EPA within 6 weeks of completion of construction. The <br />report will include: <br />2. As built surveyed topography contours of the mitigation area, including water surface <br />area. <br />3. Locations of installed monitoring wells. <br />4. Location of installed protection measures, i.e., fencing. <br />5. Location of irrigation pump and supply line <br />6. Locations of as -built planting zones. <br />7. Copies of seed bag tags, showing purity, weed content, germination, net weight, date of <br />seed testing, and date of shipment. <br />8. Copies of cuttings receipt, showing quantities and date of harvest. <br />9. Date of planting/seeding. <br />10. Details describing any deviation from original plans. <br />VI. MAINTENANCE DURING MONITORING PERIOD <br />A. Maintenance Activities <br />1. Maintenance and Monitoring will occur for a period of five years following the <br />completion of mitigation work. The monitoring period can be reduced only if annual <br />reporting demonstrates that all success criteria have been met for two consecutive years <br />and have been verified by an EPA/COE site inspection. <br />2. Weekly site visits will be conducted by designated Elam personnel to evaluate for the <br />presence of noxious weeds and every other week water well measurements will be taken. <br />3. No less than three site visits will be conducted during the first two years by a WWE <br />biologist. Site visits will be conducted biannually for the following three years of <br />monitoring (Table 5). <br />4. Site visits will include inspection of erosion, damage due to herbivores, plant health and <br />coverage, monitoring of groundwater table, weed infestations, erosion, and irrigation. <br />B. Responsible Parties <br />1. Elam will be responsible for weekly monitoring and reporting to WWE in between <br />scheduled visits by WWE personnel. <br />WestWater Engineering Page 17 of 24 July 2012 <br />