My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-27_REPORT - M2008022
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2008022
>
2015-10-27_REPORT - M2008022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:58 PM
Creation date
10/28/2015 9:03:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008022
IBM Index Class Name
REPORT
Doc Date
10/27/2015
Doc Name
Proposed Mitigation Plan
From
WestWater Engineering for Elam Construction, Inc.
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zone 3: Upland Terrestrial Herbaceous <br />Species PLS lbs/acre <br />Bluebunch wheatgrass (Pseudoroegneria spicata ssp.) 5.00 <br />Western wheatgrass (Pascopyrum smithii) 5.00 <br />Mountain brome (Bromus marginatus) 7.00 <br />Great basin wildrye (Leymus cinereus) 5.00 <br />Indian ricegrass (Achnatherum hymenoides) 3.00 <br />Total 25.00 <br />1. Planting Zones depicted in Figure 6. <br />2. Grass seed will be obtained from the same or previous year's crop. Certified weed -free seed <br />will be used. All seed will be free of prohibited noxious weeds (as defined by the State), <br />and will contain no greater than 1% other weeds. <br />3. Seed will be furnished and delivered premixed in the indicated proportions. Seed bag tags, <br />or the equivalent, will be provided for each delivery of seed. Tags will show the guaranteed <br />percentages of purity, weed content, germination, net weight, date of seed testing, and date <br />of shipment. <br />J. Schedule <br />Table 4. Implementation Plan Schedule <br />D ,Task Name <br />1 isoil Sample <br />2 ;Photo Points <br />3 Spring Runoff <br />4 {'Storm Water <br />5 _Strip Top Soil <br />6 __^iOrganics <br />7 Dirt Work <br />8 'Add Top Soil, Organics, and Soil Amendments <br />9 ' y <br />Final Grading <br />10 Post Construction Survey <br />11 Plantings - Seed Broadcast <br />12 Mulch/Crimping <br />13 install Plant Gridding <br />14 'Plantings - Cuttings <br />15 `Install Monitoring Wells <br />Y6 As -Built Report <br />May <br />2011 <br />Jul <br />AuR_. i --Sep _. <br />K. Irrigation Plan <br />1. Elam has the available water rights to pump 2.5 cfs out of the Anna Branch Canal. The <br />timeline and the total quantities needed, will dictate the method of withdrawal from the <br />source and how the water is distributed onsite. <br />2. Irrigation water may be used in the first few years to initiate plant growth and root <br />development and also to deter invasive weeds, exotics and invasive establishment, i.e., <br />Tamarisk and Russian olive. <br />WestWater Engineering Page 16 of 24 July 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.