Laserfiche WebLink
October 19, 2015 C-1982-056/Foidel Creek Mine JLE <br />Figure 3. Repairs made to northwest slope of the Fish Creek Tipple reclaimed area. <br />SUPPORT FACILITIES - Rule 4.04: <br />The Old 18RT Borehole area was observed. The area is vegetated and stable. The sump at the southwest corner <br />of the pad was clear and functional. <br />The Operator is continuing to install the 5RT pipeline. The manhole and T -valve has been installed northwest of <br />the 6MN reservoir. An excavator was stationed at the west end of the pipe line. The pipeline has been buried on <br />the east side of the 6MN reservoir. The southern line south of the 6MN reservoir has not been buried but the <br />pipeline is staged and ready to be installed. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 7 of 12 <br />