Laserfiche WebLink
Fish Creek <br />-Site 16A <br />• Flow was not reported in April, but an additional <br />reading was collected in May. <br />-Site 27A <br />• Flow was reported in April, but an additional reading <br />was collected in May. <br />• Water level and field parameters were not reported <br />weekly in August and for one of the first two weeks <br />in September as required. <br />-Site 1003 <br />• Monthly Sulfate(Lab) levels were not reported for <br />May and July, 2014. <br />• Weekly water levels and field conductivity were not <br />reported for January, February, March, May, <br />October, November and December, 2014. <br />• Monthly Sulfate(lab) levels for January, February, <br />April, May, July, October, November and December, <br />2014 were not reported. <br />-Site SW 13 <br />• Table 43 indicates that no monitoring is required <br />October thru February. Exhibit 14 for the October <br />thru February schedule indicates this site should be <br />monitored for flow quarterly. Given this, Flow <br />should have been measured in the 4' quarter. <br />-Site SW14 <br />• Table 44 indicates that no monitoring is required <br />October thru February. Exhibit 14 for the October <br />thru February schedule indicates this site should be <br />monitored for flow quarterly. Given this, Flow <br />should have been measured in the 4' quarter. <br />• It was reported that the site was frozen in March of <br />2014 and a reading was not obtained. <br />-Site SW15 <br />• Table 45 indicates that no monitoring is required <br />October thru February. Exhibit 14 for the October <br />thru February schedule indicates this site should be <br />monitored for flow quarterly. Given this, Flow <br />