My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-14_REPORT - C1982056
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2015-10-14_REPORT - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:03:50 AM
Creation date
10/14/2015 12:55:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
10/14/2015
From
DRMS
To
Twentymile Coal Company
Annual Report Year
2014
Permit Index Doc Type
Hydrology Report
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
should have been measured in the 4t'' quarter. <br />Middle Creek <br />-Site MC -1 and USGS 0943700 <br />• Exhibit 14 indicates these two site will be monitored <br />during June thru September each year. No <br />monitoring data was submitted. <br />Natural Springs: <br />-Site SW -1 <br />• Water quality parameters were not reported semi- <br />annual as approved in Exhibit 14. The site was <br />reported to be dry during the 2nd round of sampling in <br />September of 2014. <br />-Site SW -2 <br />• Spring was reported to be dry in 2014. <br />Spoil Springs <br />-Site 7 <br />• Site was reported to have not discharged during the <br />1St quarter. No data was reported for the 4t' quarter. <br />Please submit the required data for the 4t' quarter. <br />-Site 303-1 <br />• Water quality parameters were not reported semi- <br />annual as approved in Exhibit 14. Please indicate if <br />the second round of water quality sampling was <br />conducted. If so, please submit this data. <br />Mine Discharge <br />-Site 109 and 115 did not discharge in 2014. <br />Temporary Construction Dewatering Discharge <br />-Site OOIA did not discharge in 2014. <br />12. Parameters to be <br />Exhibit 14 of CDRMS <br />Each surface water monitoring site was evaluated to <br />sampled at surface <br />mining permit C-82-056 <br />determine if the required parameters were sampled in <br />water sites <br />accordance with the water monitoring plan from Exhibit 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.