Laserfiche WebLink
Table A-Iu.5 <br />calculations for time requires for topsoiling - AE Pit <br />gage No. <br />2b <br />AE Pit <br />TruckHaul$ <br />Production <br />Adjusted* <br />Fleet <br />Route <br />Cubic <br />Rate <br />Production <br />Scraper/Truck <br />Fleet <br />Cost <br />Total <br />From <br />Yards <br />c ds/hr <br />c ds/hr <br />Hours <br />Hours <br />/hr <br />M <br />/c <br />Al -08 <br />228,206 <br />223.05 <br />223.05 <br />1023 <br />127.89 <br />$ 3,452.17 <br />$ <br />441,496.25 <br />$ <br />1.93 <br />6.61: <br />104 <br />2W5 <br />$2,563-45 <br />$ <br />53,32£- 4 <br />$ <br />19.69 <br />AET-1 <br />24,718 <br />219.27 <br />219.27 <br />113 <br />14.09 <br />$ 3,452.17 <br />$ <br />48,644.79 <br />$ <br />1.97 <br />G1-01 <br />101,948 <br />173.74 <br />173.74 <br />587 <br />73.35 <br />$ 3,452.17 <br />$ <br />253,210.13 <br />$ <br />2.48 <br />G4-02 <br />137,784 <br />242.57 <br />242.57 <br />568 <br />71.00 <br />$ 3,452.17 <br />$ <br />245,111.61 <br />$ <br />1.78 <br />Total <br />527,544 <br />220.31 <br />220.31 <br />2395 <br />552.89 <br />$ 3,023.70 <br />$ <br />1,671,782.92 1 <br />$ <br />3.17 <br />�A�w�! <br />