Laserfiche WebLink
Table A-10.4 Calculations for time required for topsoiling - F Pit <br />�F Pit Truck He* <br />Production <br />Adjusted* <br />Fleet <br />Route Cubic <br />Rate <br />Production <br />Scraper/Truck Fleet <br />Cost <br />Total <br />From Yards <br />(cvds/hr) <br />(cvds/hr) <br />Hours Hours <br />($/hr) <br />IILc <br />193,701 <br />".,,?34 <br />'- <br />267, <br />, ',f <br />3.53 <br />ITotal 193,761 <br />234 <br />234 <br />829 267 <br />$ 2,563.45 <br />$ 683,320.14T-$ 3.53 <br />