Laserfiche WebLink
Table A-10.3 <br />Calculations for time required for topsoiling - zs Pit <br />rage ivu. <br />�o <br />Zs Pit <br />Tt iit Natal, ., <br />Production <br />Adjusted* <br />Fleet <br />Route <br />Cubic <br />Rate <br />Production <br />Scraper/Truck <br />Fleet <br />Cost <br />Total <br />From <br />Yards <br />(cyds/hr) <br />(cyds/hr) <br />Hours <br />Hours <br />($/hr) <br />($) <br />($/Cy) <br />A98-2 <br />80,332 <br />151 <br />151 <br />533 <br />67 <br />$ 3,452.17 <br />$ <br />229,919.51 <br />$ <br />2.86 <br />HRS <br />11,068 <br />179 <br />179 <br />62 <br />8 <br />$ 3,452.17 <br />$ <br />26,744.75 <br />$ <br />2.42 <br />Z2-07 <br />132,907 <br />192 <br />192 <br />692 <br />86 <br />$ 3,452.17 <br />$ <br />298,538.31 <br />$ <br />2.25 <br />ZTS-4 <br />45,007 <br />184 <br />184 <br />245 <br />31 <br />$ 3,452.17 <br />$ <br />105,557.24 <br />$ <br />2.35 <br />Z1 -09A <br />- <br />[Total <br />269,314 <br />176 <br />176 <br />1531 <br />191 <br />$ 3,452.17 <br />$ <br />660,759.81 <br />$ <br />2.45 <br />