Laserfiche WebLink
A-5 D <br />Table A-5.1 <br />Drill & Blast (Hichwall <br />Reduction) <br />rage No. <br />10 <br />Pit <br />Highwall Lenath <br />Drill Hours (1) <br />pli[a <br />Benching Hrs (2) <br />Bench Cvds Blasted (3) <br />Blastina $ * <br />Total <br />AE Pit <br />2455 <br />60.11 <br />$ 12,762.45 <br />39 <br />$ 12,667.41 <br />321,085 <br />$ 70,638.70 <br />$ <br />96,068.56 <br />K,L,M Pits <br />4750 <br />284.97 <br />$ 60,504.20 <br />76 <br />$ 24,509.24 <br />1,522,199 <br />$ 334,883.78 <br />$ <br />419,897.22 <br />0 <br />0.00 <br />$ - <br />0 <br />$ - <br />0 <br />$ - <br />$ <br />- <br />0 <br />0.00 <br />$ - <br />0 <br />$ - <br />0 <br />$ - <br />$ <br />- <br />0 <br />0.00 <br />$ - <br />0 <br />$ - <br />0 <br />$ - <br />$ <br />- <br />0 <br />0.00 <br />$ - <br />0 <br />$ - <br />0 <br />$ - <br />$ <br />- <br />Total <br />7205 <br />345.08 <br />$ 73,266.65 <br />115.28 <br />$ 37,176.65 <br />1,843,284 <br />$ 405,522.48 <br />$ <br />515,965.77 <br />(1) based on 30'x <br />30' burden and spacing, 32.6 ft avg depth, pattern width <br />at 265', 160 feet per drill hour <br />' $0.22/cyd from Trapper Budget <br />(2) 16 hrs per 1000' of highwall <br />(3) from cross-sections; approx. 4750'X 265'X 32.6'/ 27 <br />K,L,M Pits <br />AE Pit <br />4750 <br />Length (Ft.) <br />2455 <br />Length (Ft.) <br />265 <br />Ave. Width (Ft.) <br />234.3 <br />Ave. Width (Ft.) <br />32.6 <br />Ave. Depth (Ft.) <br />15 <br />Ave. Depth (Ft.) <br />1,522,199 <br />Blast Highwall Volume (from cross-sections) <br />321,085 <br />Blast Highwall Volume (from cross-sections) <br />1 <br />O <br />JAN 2 8 2014 <br />