Laserfiche WebLink
Table A-4.5 <br />Regrading Pits - AE Pit (Dozer) <br />Page No. <br />15 <br />Push <br />Productivity Correction <br />Productivity <br />Dozer <br />Unit Cost <br />Total <br />Cross Section <br />Cubic Yards <br />Distance <br />(Icy/hr) <br />Factor <br />(Icy/hr) <br />Hours <br />($/hr) <br />Cost($) <br />407355 <br />100,762 <br />312 <br />930 <br />0.82 <br />763 <br />132 <br />$ <br />381.07 <br />$ <br />50,350.61 <br />406900 <br />132,650 <br />280 <br />1050 <br />0.82 <br />861 <br />154 <br />$ <br />381.07 <br />$ <br />58,709.57 <br />406400 <br />104,415 <br />241 <br />1240 <br />0.82 <br />1016.8 <br />103 <br />$ <br />381.07 <br />$ <br />39,132.01 <br />405900 <br />69,648 <br />180 <br />1600 <br />0.82 <br />1312 <br />53 <br />$ <br />381.07 <br />$ <br />20,229.24 <br />405400 <br />64,271 <br />190 <br />1550 <br />0.82 <br />1271 <br />51 <br />$ <br />381.07 <br />$ <br />19,269.67 <br />404900 <br />Total <br />471,746 <br />251 <br />1216 <br />0.82 <br />997 <br />493 <br />$ <br />381.071 <br />$ <br />187,691.09 <br />