Laserfiche WebLink
Table A-6.1 <br />Rearade Roads <br />Page No. <br />Length <br />Volume <br />Volume <br />Ripping <br />Regrade <br />Road Description <br />Type <br />(ft) <br />(bcys) <br />a@25% swell <br />Hours <br />Hours <br />BC Road <br />Walk <br />9160 <br />166237 <br />207796 <br />167.9 <br />165.7 <br />DMAIN <br />Walk <br />6700 <br />121593 <br />151991 <br />122.8 <br />121.2 <br />D#5 <br />Haul <br />1100 <br />18333 <br />22917 <br />18.5 <br />18.3 <br />D#3,4 <br />Haul <br />3000 <br />50000 <br />62500 <br />50.5 <br />49.8 <br />D#1 <br />Haul <br />4800 <br />80000 <br />100000 <br />80.8 <br />79.7 <br />ASHW EST <br />Haul <br />9200 <br />153333 <br />191667 <br />154.9 <br />152.8 <br />ASHEAST <br />Haul <br />6700 <br />121593 <br />151991 <br />122.8 <br />121.2 <br />LOM <br />Walk <br />19150 <br />347537 <br />434421 <br />351.0 <br />346.4 <br />Middle A <br />Haul <br />9060 <br />151000 <br />188750 <br />152.5 <br />150.5 <br />North A <br />Haul <br />6780 <br />113000 <br />141250 <br />114.1 <br />112.6 <br />Middle Z # 1 <br />Haul <br />3520 <br />58667 <br />73333 <br />59.3 <br />58.5 <br />Middle Z # 2 <br />Haul <br />2560 <br />42667 <br />53333 <br />43.1 <br />42.5 <br />F3 <br />Haul <br />3000 <br />50000 <br />62500 <br />50.5 <br />49.8 <br />F2 <br />Haul <br />800 <br />13333 <br />16667 <br />13.5 <br />13.3 <br />K2 <br />Haul <br />1750 <br />29167 <br />36458 <br />29.5 <br />29.1 <br />K3 <br />Haul <br />3400 <br />70000 <br />87500 <br />70.7 <br />69.8 <br />L Road <br />Haul <br />4450 <br />74167 <br />92708 <br />74.9 <br />73.9 <br />L2 <br />Haul <br />1330 <br />22167 <br />27708 <br />22.4 <br />22.1 <br />L3 <br />Haul <br />550 <br />9167 <br />11458 <br />9.3 <br />9.1 <br />L4 <br />Haul <br />860 <br />14333 <br />17917 <br />14.5 <br />14.3 <br />North A # 2 <br />Haul <br />4200 <br />70000 <br />87500 <br />70.7 <br />69.8 <br />Middle A Road # 2 <br />Haul <br />1100 <br />18333 <br />22917 <br />18.5 <br />18.3 <br />East A <br />Haul <br />5700 <br />95000 <br />118750 <br />96.0 <br />94.7 <br />East A Split <br />Haul <br />1700 <br />28333 <br />35417 <br />28.6 <br />28.2 <br />Mine Access <br />Access <br />6600 <br />54022 <br />67528 <br />54.6 <br />53.8 <br />1991.9 <br />1965.7 <br />