Laserfiche WebLink
A <br />AGGREGATE <br />Mr. Tyler O'Donnell, Division of Reclamation Mining and Safety INDUSTRIES <br />September 26, 2015 <br />Page Two <br />Disaster Assessment Meeting, a FEMA Applicant Briefing, a FEMA Kickoff Meeting, and <br />number of site visits and smaller meetings. <br />The city is currently working with FEMA and the State to develop a number Project <br />Worksheets (PWs) that describe the work we would propose to improve both for <br />Permanent Repair and Mitigation of damages from future floods. <br />Ms. Hunt also updated the Chronology of West Cooley Reservoir Flood Damage Related <br />Events that was included under AI's Exhibit 5 at the August 26, 2015 MLRB hearing. <br />The update is enclosed for reference. <br />Neither Ms. Hunt nor Thornton's Risk Management Division have been able to provide a <br />time line when the scope of work for repairs and mitigation will be available. Based <br />upon the time line in Thornton's chronology related to the September 2013 flood, Al <br />would anticipate another thirty to sixty days before that information is available, with <br />final agency approvals occurring sometime after that. Al therefore requests an extension <br />of time to November 30, 2015 to provide a flood control mitigation plan or another status <br />update to the Division. <br />Thank you for your consideration in this matter. <br />Very truly yours, <br />Connie N. Davis <br />Land Advisor <br />Enclosure <br />cc: Tony Waldron (tony.waldron(kstate.co.us) <br />Wally Erickson (wally.erickson@state.co.us) <br />Timothy J. Flanagan, Esq. (t_flanagan@fsf-law,com) <br />