Laserfiche WebLink
September 21, 2015 C-1982-056/Foidel Creek Mine JLE <br />Figure 2. 5MN Pipeline installation project. <br />Figure 3. 5MN pipeline reclaimed corridor. <br />"T" location northwest of 6MN reservoir. <br />The 6MN ventilation shaft area was observed. The diversion ditch leading to the sediment pond has been cleaned <br />out and the riprap check dams and HDPE waddles have been cleaned out on the upstream side. The slope above <br />the ditch and sediment pond has several bare spots that will need to be seeded. <br />The barricade chamber pad area was stable and no problems were observed. <br />The 16LT Utility Borehole was observed. Near the access road entrance to the pad, the embankment has eroded <br />and TC has applied several erosion control techniques to stabilize the area. Erosion control matting has been <br />installed and heavy cattle use of the area has damaged the matting. However, significant erosion of this portion of <br />the pad was not observed during this inspection, however the area is devoid of vegetation and will need to be <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 5 of 10 <br />