My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-09-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:10:49 PM
Creation date
9/22/2015 12:11:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/17/2015
Doc Name
Assurance Report
From
Newmont Mining Corporation
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />A Cat excavator cleared and grubbed the area around the underdrain pump back ponds and <br />placed rip -rap on the east toe berm surface diversion channels. Ames also continued pumping <br />groundwater through the 2" permanent pipe into the PSSA. <br />Geomembrane: <br />Geomembrane installation within Phase 1 continued this week performing deployment, seaming, <br />repair, and QA/QC activities. Approximately 127,378 square feet of 80mil LLDPE geomembrane <br />was deployed. Soil Liner Fill was inspected and approved by AMEC, Ames and ECA <br />representatives prior to geomembrane deployment. Approximately 6,984 linear feet of seam was <br />fusion welded during deployment using one or two fusion welding machines for each day of <br />deployment. Approximately 75 linear feet of seam was extrusion welded during deployment. <br />Destructive and non-destructive testing was completed in compliance with project technical <br />specifications. <br />Ames continuously excavated anchor trench ahead of geomembrane installation. After <br />geomembrane testing was completed, the anchor trench above finished panels was backfilled <br />and compacted per project specifications. <br />See attached figure for approved geomembrane. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.