CRIPPLE CREEK & VICTOR GOLD MINING Co. * <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Subgrade: <br />Phase 1 areas dozed to finished grade were compacted per project plans and specifications. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />A Cat smooth drum roller, a Cat excavator and a water truck conditioned and compacted SLF <br />prior to geomembrane depolyment. <br />A Cat dozer built an SLF road below station F14+00 for Cat 740 haul trucks to deliver SLF <br />material to the fill areas.Cat dozers placed SLF below stations F12+00 to F24+00. A Cat smooth <br />drum roller compacted SLF between stations F24+00 to F28+00. <br />Cat 777 haul trucks stockpiled Cameron SLF in the vicinity of stations 45+00 to 48+00 of the ADR <br />haul road. <br />A Cat dozer placed SLF in the vicinity of station FM16+00. <br />All of the above Soil Liner Fill material was placed, graded, and compacted per the project plans <br />and specifications. Moisture content, density testing and depth verification were performed per <br />project specification prior to surface acceptance and geomembrane installation. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />A Cat excavator loaded 740 haul trucks with excess material after removing the DCF access road <br />near station B10+00. The material was transported to the DCF fill areas. <br />A Cat excavator removed unsuitable material from atop geomembrane where SLF eroded into <br />DCF at station 14+00 of the ADR haul road. A Cat excavator repaired several washouts in the <br />already placed DCF fills. <br />See attached figure for approved DCF <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: None. <br />Leak Detection: <br />A Cat excavator prepared approximately 200 LF of leak detection trench between stations <br />FM8+00 to FM10+00. Leak detection was installed and backfilled per project plans and <br />specifications. <br />