Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. AT <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: September 5, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 8.30.2015 through 9.5.2015 <br />Days <br />S <br />I M T <br />I W <br />I T <br />F <br />S <br />Work Shifts <br />D <br />D D <br />D <br />D <br />D <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week I Weather Conditions During Week: <br />Highs: 64°F to 75°F Cloud Cover: Cloudy to Mostly Cloudy <br />Lows: 46°F to 48°F Precipitation: Rain <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred <br />A Cat dozer graded slopes in the vicinity of station FM4+00 to FM6+00. Cat dozers prepared <br />subgrade between stations HM4+00 to HM8+00 and J14+00 to JM6+00. <br />A Cat excavator slope graded the subgrade between stations L4+00 and H29+00. <br />Cat dozers finished subgrade between stations F24+00 and H22+00 and below stations H4+00 to <br />H8+00 and L6+00 to L8+00. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />