Laserfiche WebLink
Task description: <br />Site: Deserado Mine <br />Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Recontour CR65 Intersection <br />Permit Action: Permit Renewal 06 Permit/Job #: C 1981018 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: Colorado <br />Date: 7/16/2014 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />ipti <br />Truck Loader Team - Truck: Cat 770D <br />- Loader: CAT 980H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: 010 <br />Shift basis: der day <br />('act Rreakrinwn- Trudr11.nndpr Tenm Rnnnnrt FnninmPnt MnintannnrP RnuinmPnt <br />Total work team costihour: $647.96 <br />MATERIAL QUANTITIES <br />Initial volume: 1,000 CCY Swell factor: 1.111 <br />Loose volume: 1,111 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Caracity• <br />Truck Payload (weight) Basis: <br />Material weight: 2,743 Pounds /LCY <br />Description: User Provided <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 29.89 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />95 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$48.57 <br />$43.89 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$89.44 <br />$72.75 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$26.72 <br />$37.13 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$164.73 <br />$153.77 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />3 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $647.96 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team costihour: $647.96 <br />MATERIAL QUANTITIES <br />Initial volume: 1,000 CCY Swell factor: 1.111 <br />Loose volume: 1,111 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Caracity• <br />Truck Payload (weight) Basis: <br />Material weight: 2,743 Pounds /LCY <br />Description: User Provided <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 29.89 LCY <br />CIRCES Cost Estimating Software <br />