My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-12_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018
>
2015-08-12_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 12:56:52 PM
Creation date
8/13/2015 1:08:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
8/12/2015
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd <br />Task # 010 <br />Truck Bed (volume) Basis: <br />Source <br />Altitude Ad': <br />Struck Volume: <br />21.60 <br />LCY <br />Heaped Volume: <br />31.70 <br />LCY <br />Average Volume: <br />26.65 <br />LCY <br />Adjusted Volume: <br />29.89 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: <br />Loading Tool Capacity <br />Rated Capacity: _ <br />Bucket Fill Factor: _ <br />Adjusted Capacity: <br />Job Condition Corrections: <br />7.500 <br />0.875 <br />K CC2 <br />Page 2 of 3 <br />26.25 LCY <br />Bucket Size Class: NA <br />LCY (heaped) <br />Loose material - 1" and over (85 - <br />LCY <br />0.875 <br />Site Altitude (ft.): 5300 feet <br />Net Correction: 1 0.830 0.830 <br />Loadina Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 4 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.550 <br />passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />CAT HB <br />Net Correction: 1 0.830 0.830 <br />Loadina Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 4 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.550 <br />passes <br />minutes <br />Cycle Time Factors <br />Factor min. <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />Cat HB <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />Cat HB <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />Cat HB <br />Operation: <br />Constant op eration -0.04 <br />-0.040 <br />Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Net Cycle Time Adjustment: -0.050 minutes <br />Adjusted Loader Cycle Time: 0.500 minutes <br />Net Load Time per Truck: 1.600 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.60 Minutes Adjusted for site altitude: 0.600 Minutes <br />Truck Load Time: 1.600 Minutes Adjusted for site altitude: 1.600 Minutes <br />Truck Maneuver and Dump Time: 1.00 Minutes Adjusted for site altitude: 1.000 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Very hard, smooth, asphalt or concrete, no tire <br />penetration 1.2 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.