Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 009 Page 2 of 2 <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.900 <br />AB.AVG. <br />1.000 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT /DAY) <br />0.900 <br />(SSD -FC) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.838 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5087 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />632.42 LCY /hr <br />2529.68 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.415/LCY <br />Total job time: <br />Total job cost: <br />32.90 Hours <br />$34,518 <br />CIRCES Cost Estimating Software <br />