2015-07-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-07-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:13 PM
Creation date
7/20/2015 8:31:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/17/2015
Doc Name
Weekly CQA Report - weeks ending 6/20/2015 and 6/27/2015
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />a layer of 12 -inch minus rock, Drain Cover Fill and geofabric to complete the modified <br />drainage area into the tertiary underdrain. <br />A technical memo will be generated to address deviation of design with respect to the <br />tertiary underdrain. <br />Leak Detection: <br />A Cat mini -excavator prepared approximately 200 LF of leak detection trench. The leak detection <br />was completed per project plans and specifications between stations FM15+00 and FM17+00. <br />Miscellaneous: <br />Amec personnel continued LVSCS pump monitoring and observation. <br />B) Underground Workings: <br />UG #6050: Completed two layers of geogrid installation. Completed placement and compaction <br />of two 6 -inch lifts of Select Structural Fill. Remediated. <br />UG #6004: Step 2: Completed three layer geogrid installation. Completed placement of the three <br />6 -inch lifts of Select Structural Fill. Cat excavators prepared subgrade for Step 3 geogrid. <br />Further remediation required. <br />UG #6455: Continued drilling operations, 1,150LF. Further remediation required. <br />UG #6538: Production drilling and a production blast occurred during this reporting period. <br />Further remediation required. <br />UG #6687: A Cat 330 excavator excavated to competent rock (+/-20'). Backfilled and <br />compacted per project specifications. Remediated. <br />UG #6468: A Cat 330 excavator coned working for concrete plug. Further remediation required <br />C) Geomembrane: <br />Geomembrane installation within the PSSA continued this week performing deployment, <br />seaming, repair, and QA/QC activities. Geomembrane installation was performed at the ADR <br />pad and PSSA northwest slope. Approximately 146,644 square feet of 80mil LLDPE <br />geomembrane was deployed. Soil Liner Fill was inspected and approved by AMEC, Ames and <br />ECA representatives prior to geomembrane deployment. Approximately 7,568 linear feet of seam <br />was fusion welded during deployment using one or two fusion welding machines for each day of <br />deployment. No extrusion welding was performed during this reporting period. Destructive and <br />non-destructive testing was completed per technical specifications. <br />Ames continuously excavated anchor trench ahead of geomembrane installation. After <br />geomembrane testing was completed, the anchor trench above finished panels was backfilled <br />and compacted per project specifications. <br />See attached figure for approved geomembrane. <br />II) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed to direct storm water into the Phase 1 <br />diversion channel and sedimentation pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.