My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-07-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:13 PM
Creation date
7/20/2015 8:31:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/17/2015
Doc Name
Weekly CQA Report - weeks ending 6/20/2015 and 6/27/2015
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. A <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Placement and compaction of the Phase 1 & 2 Structural Fill <br />materials; placement, compaction, density testing and depth verification of Soil Liner Fill materials; pump <br />monitoring at the LVSCS riser pipes; tertiary underdrain construction; leak detection construction; soil <br />liner fill acceptance; geomembrane installation and acceptance; and remediation of underground <br />workings. <br />Laboratory Activities: <br />Concrete testing, atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected: Phase 1 — Drain Cover Fill; 1 -DCF -3-R <br />Phase 1 — Soil Liner Fill; 1-SLF-12-R <br />Cameron —Soil Liner Fill; SLF-183-C <br />General Project Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held June 17, 2015 (Amec Foster Wheeler, CC&V, Ames). Amec <br />Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor ✓� <br />Submitted by: <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: a— <br />CC&V Projects <br />Reviewed By: <br />Date: June 30, 2015 <br />Date: % � <br />Date: <br />Reviewed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.