Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />Subgrade: <br />No new subgrade was approved during this reporting period. <br />See attached figure for approved subgrade. <br />Soil Liner Fill: <br />John Deere and Cat excavators loaded Cat 740 haul trucks with material from the Phase 1 <br />stockpile to be transported to the C Bench, E Bench and the DD Bench. <br />Cat dozers finished SLF surface between D5+00 and D6+00. A Cat skidsteer and a Cat smooth <br />drum roller finished and compacted SLF surface between C0+00 and C2+00. <br />A Cat dozer replaced Soil Liner Fill in the area above B16+00 where the geomembrane was <br />removed and the slope was reconditioned. A Cat smooth drum roller compacted the fill area. All <br />testing was completed per project specifications before the area was approved for geomembrane. <br />Cat dozers placed SLF between stations A10+00 to A14+00 and C6+00 to C14+00 and E4+00 <br />and E8+00 and DD6+00 to DD12+00. <br />All SLF material was placed and compacted per project plans and specifications. <br />Nuclear Density tests, N71 — N90, were completed with passing results. Depth checks, D50 — <br />D60, were completed with passing results. <br />See attached figure for approved SLF. <br />Drain Cover Fill: <br />Cat 740 haul trucks transported DCF from the stockpile to Phase 1. Low ground pressure Cat <br />dozers placed DCF on approved geomembrane in Phase 1. <br />See attached figure for approved DCF. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: None. <br />Tertiary Underdrain: A Cat excavator and a Cat hammer continued excavating trench <br />for the tertiary underdrains between stations A17+00 and A21+00. Construction of the <br />tertiary underdrain adhered to project plans and specifications. Approximately 500 LF of <br />tertiary underdrain was completed. <br />A Cat 330 excavator removed unsuitable material from two sections of the slope above <br />station A15+00 and A15+50. The slope above A15+00 was replaced with a layer of 12 - <br />inch minus rock and topped with Drain Cover Fill and geofabric to allow underground <br />springs to freely flow into the secondary underdrain. Excavation of the slope above <br />A15+50 and construction of the modified drainage area will continue. <br />