Laserfiche WebLink
5. Please specify where the third adit will daylight and identify this location on the Mining and <br />Reclamation Plan Maps. In addition, please provide the following information: <br />a) Dimensions of the adit. <br />b) Specify if the edit will be built out from its terminus. If" so, provide details on how the <br />portal will be constructed including a detail drawing. <br />c) Specify the total volume of waste rock to be gencrated and describe how the waste <br />rock will be handled during construction of the adit./portal. <br />d) Specify the total area of disturbance associated with the construction of the alit, <br />The location of where the third adit will daylight is still unkown though it is expected to daylight within <br />the permitted boundary. Once the surface location of the third adit is decided on, RRE will submit a <br />technical revision identifying the location on the Mining and Reclamation Plan Maps and describing the <br />information requested above. RRE expects to post an additional financial warranty in conjunction with <br />the technical revision for the third adit based on an updated reclamation plan and cost estimate <br />inclusive of the third adit. <br />6. Please specify how the adits will he safeguarded during active mining operations. <br />The adits will be safeguarded during active mining, initially by the locked gate at the base of the access <br />road as identified on revised Mining Plan Maps attached hereto. Additionally, the adit is guarded by two <br />steel sets of doors located at the portal entrance and the second is located inside of the portal. These <br />doors are both kept under lock and key unless there are work crews underground. <br />7. The Mining Plan states that blasting materials and magazines will be stored per the <br />requirements of the Plan of Operations (POO). In addition, the Mining Plan states that <br />explosives would be stored off-site until a safe underground storage facility is created. Please <br />clarify if the underground storage facility has been constructed. <br />No, the underground storage facility has not yet been constructed. <br />8. As required by Rule 6.3.3(1)(h), please specify the source of water to be used in conjunction <br />with the mining operation. <br />The water will be sourced from a hose at the Dolly Varden Ranch in Alma, CO which, RRE rents from the <br />owner during the mining season. This is a legal source of water. <br />