Laserfiche WebLink
9. Phase clarify if the proposed S' x 16' storage shed has been constructed. <br />No, the proposed storage shed has not yet been constructed. <br />10. Please provide a brief description of how the site will be safeguarded and stabiiized during <br />periods of inactivity. <br />The site will be safeguarded during periods of inactivity, initially by the locked gate at the base of the <br />access road as identified on revised Mining Plan Maps attached hereto. Additionally, the adit is guarded <br />by two steel sets of doors located at the portal entrance and the second is located inside of the portal. <br />These doors will both be kept under lock and key. In addition to these safeguards, a pile of waste rock <br />will be piled in front of the portal entrance leaving it relatively inaccessible and strongly discouraging of <br />trespassers. <br />11. As required by Rule 6.3.4(2), please provide an estimate of the actual costs to reclaim the site <br />based on what it would cost the State of Colorado using an independent contractor to <br />complete reclamation. The unit costs should include estimates for the following activities: <br />backfilling and grading. Unit costs (cost per cubic yard), volumes, haul or push distances, <br />and grades must be included when backfilling and grading are part of the Reclamation Plan. <br />Please see the revised reclamation cost estimate attached below. This estimate is based on the <br />previously approved NOI. There will be additional financial warranty reclamation estimates submitted <br />with any technical revisions that have been proposed herein this document. For example, the third adit <br />will have an additional reclamation estimate submitted with the technical revision for this aspect of the <br />project. <br />