1. As required by Rule 1.6.2(1)(g), please submit proof the public notice was circulated to all <br />owners of record of surface lands, and easement holders that are on the affected land and <br />within 200 feet of the boundary of the affected land. Proof of notice may be return receipts <br />of a Certified Mailing or by proof of personal service. <br />The only owners of record within 200 feet of the affected land are the USFS/BLM, as depicted on the <br />revised Mining Plan Maps, whom Red Rock Exploration, LLC (RRE) holds its claims with and has an <br />approved Plan of Operations (POO) through. The POO was attached to the original application and can <br />be referred to as proof of notice. <br />2. The Mining and Reclamation Plan Maps depict an intermittent stream to the south of the <br />proposed operation. As required by Rule 6.3.2(c), please identify this stream and provide any <br />available information regarding flow rates. <br />The intermittent stream to the south of the property is a seasonal snow melt pathway and only <br />recognized as an intermittent stream on certain base maps. This is not a regularly flowing stream and <br />therefore is not recognized, named nor is there any information regarding flow rates. <br />3. The Mining Plan states two adits are currently open and a third will be added. Please confirm <br />the decommissioned adit will not be utilized as a part of the proposed mining operation. In <br />addition, the adit should be clearly labeled as 'decommissioned' on the Mining Plan Map, <br />Currently, there are no plans to utilize the decommissioned adit though, there may be a point in the <br />future of this operation where RRE would reopen it if deemed necessary. At which point, a technical <br />revision to this permit application would be submitted with relation to reopening the decommissioned <br />adit. <br />4. The Mining Plan states portal stabilization and construction of the 20ft. portal entrance is <br />ongoing. Please clarify if this work has been completed and provide the Division with a <br />detail drawing of the portal enclosure. <br />The portal construction and stabilization has not yet been completed and is still ongoing. The portal was <br />approved in the original NO1 application which can be referred to for additional details. Upon <br />completion of the portal construction RRE will submit a technical revision with a final detailed sketch of <br />the portal enclosure. <br />