Laserfiche WebLink
Cycle Time factors <br />1396.36 LCY/Hour <br />Factor (min.) Source <br />Material: <br />Material 6" and over diameter 0.03 <br />0.030 (Cat HO) <br />Stockpile: <br />Dumped by truck 0.02 <br />0.020 (Cat 1-18) <br />Truck Ownership: <br />Independently owned trucks 0.04 <br />0.040 (Cat HB) <br />Operation: <br />Constant Operation -0.04 <br />-0.040 (Cat HB) <br />DwnpTarget: <br />No adjustment- factor not applicableO.00 <br />0.000(Cat HB) <br />Net Cycle Time <br />Adj. Loader Cycle Time <br />Net Load Time per Truck <br />0.050 Minutes <br />0.675 Minutes <br />0.775 Minutes <br />Truck Cycle Time <br />Truck Exchange Time: 1 0.6001 Minutes lAdjusted for Altitude 0.600 Minutes <br />Truck Load Time: 0.775 Minutes lAdjusted for Altitude 0.775 Minutez <br />Truck Maneuver and Dump Time: 1.000 Minutes Adjusted for Altitude 1.000 Minutes <br />Truck Travel (Haul & Return) Time: Maintained 2.0 <br />Road Condition: Hard, smooth, stabilized, surfaced, watered <br />.—I -- <br />Loading <br />,.— <br />Loading Tool Unit Production: <br />1396.36 LCY/Hour <br />Adjusted for Job Efficiency: <br />1158.98 LCY/Hour <br />Truck Unit Production: <br />373.83 LCY/Hour <br />Adjusted for Job Efficiency: <br />310.28 LCY/Hour <br />Optimal No. of Trucks: <br />6.63 Truck(s) <br />Selected No. of Trucks: <br />6.00 Truck(s) <br />Adjusted Hourly Truck Team Production: <br />1861.65 LCY/Hour <br />Adjusted Single Truck/Loader Team Production: <br />1861.65 LCY/Hour <br />Adjusted Mutt. Truck/Loader Team Production: <br />1861.65 LCY/Hour <br />LOB TIME AND COST <br />fleet Size: <br />1 Team(s) <br />Total Job Time: <br />57.28 Hours <br />Unit Cost: <br />$0.89 /LCY <br />Total Job Cost: <br />$95,285.05 1 Dollars <br />Roberts Quarry, DRMS File No. M-1977-301 Surety Reduction Request <br />